My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5A1
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
12-13-12 Packet
>
5A1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:20:43 PM
Creation date
12/10/2012 4:06:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LFAYAYA <br /> Additional Design Tasks <br /> • Design and plans for decorative City street lighting. <br /> • Analysis, design and plans for an additional detention pond and outlet control <br /> structure to serve the Caroline Properties (Gates) development. <br /> • Water line extension added on East Barbie Street. <br /> • Two additional plan revisions for the Carl Kay Parcel <br /> • Traffic analysis and multiple drive revisions for Lock Joint Tube. <br /> a Reversion back to previous designs caused by LJT building addition. <br /> • Design of a construction access driveway for Heraeus Kulzer. <br /> • Quotation project and documents for a separate demolition contract of three parcels. <br /> • Additional survey and design work for West Chippewa (south side). <br /> • 2nd Letting and Construction Documents (submitted on October 2, 2012). <br /> • Wendy's drive revision. <br /> • Additional plan work for Falls Creek irrigation and lighting. <br /> • Preparation of 3`d Letting and Construction Documents. <br /> Additional Coordination Tasks <br /> • Prepare agreement/offer document for AMC Theatres & Caroline Partners. <br /> • Extra meetings with Lock Joint Tube, South Gateway Properties, Pinney Drive quote. <br /> • Coordination and completion of locating work on Ladson's septic tank. <br /> • Assistance with AEP Transmission Relocation Agreement. <br /> • Coordination with Falls Creek Development - additional site research. <br /> • Preparation of Replat (legal descriptions, easements). <br /> • Coordination, Specifications, Public Meeting and Sign Design for City's Project <br /> Communication Outreach. <br /> • Preparation of Miscellaneous Exhibits/Drawings for Property Acquisition. <br /> December, 2012 Page 2 Project File No. 9022.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.