My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Private Sewer Facilities Agreement & Right Access License - Outlines Terms for Private Sewer – Four Horsemen Ventures
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Private Sewer Facilities Agreement & Right Access License - Outlines Terms for Private Sewer – Four Horsemen Ventures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 4:10:06 PM
Creation date
2/23/2021 4:09:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(2) Except as provided in Subsections (5) and (6) of this section, for every new connection to the South Bend Municipal <br />Water Works, a system development charge of five hundred dollars ($500.00) shall be collected per ERU and additional <br />portion thereof to be connected. All charges shall be billed by the City at the time the application for service is filed. <br />(3) System development charges per ERU shall also be collected from existing customers undertaking activities <br />producing a permanent increase in water flow of greater than three hundred ten (310) gallons per day. This subsection <br />shall not apply to an existing customer who has, by contract, purchased reserved capacity from the City so long as the <br />customer's flows remain within the reserved capacity. A permanent increase shall be deemed to have occurred when <br />the average flow rate for six (6) consecutive months exceeds the current flow rate by at least three hundred ten (310) <br />gallons per day. <br />(a) The property owner may pay all charges in full prior to time the installation work is commenced. Prepayment of <br />expenses in advance under this section shall entitle the owner to a ten (10 ) percent discount of the total charge. <br />Sec. 17-85. - Methods of payment; prepayment with discount; installment plan. <br />(6) Where a prospective customer seeks to connect a new structure on property which replaces a prior structure of a <br />similar use what was located on the same property and which was connected to the South Bend Municipal Sewer <br />Works, no system development charge will be collected. For instance, if the prior structure was a single family structure <br />and the new structure is to be used as a multi-family structure, a system development charge, as contemplated herein <br />this section, shall be charged. The Board of Public Works shall make the final determination of whether the new property <br />structure is a similar use to the prior property structure for the purposes of this subsection. <br />(4) For multifamily structures (e.g., apartments, condominiums, mobile home communities), each individual unit shall be <br />one (1) ERU. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as <br />computed pursuant to 327 IAC 3-6-11 in relationship to three hundred ten (310) gallons per day. For structures not listed in <br />327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the water <br />capacity certification for the structure and three hundred ten (310) gallons per day. <br />(5) For customers with greater than twenty (20) ERUs as calculated pursuant to subsection (4) of this section, the ERU shall <br />be adjusted based upon the Peaking Factor as computed herein. The Peaking Factor shall be calculated by dividing <br />the Peak Daily Flow by the Average Daily Flow, both as reported in the water capacity certification. In no event will a <br />Peaking Factor less than 2.0 be used for purposes of the adjustment described in this subsection. The Peaking Factor <br />divided by 4.0 (the Peaking Factor for residential connections) will be multiplied by the number of ERUs for purposes of <br />computing the system development charge owed by the customer. The City Board of Works may execute a contract <br />with the customer authorizing an increase to the initial System Development Charge based upon actual usage data <br />that is collected after connection. <br />(6) Where a prospective customer seeks to connect a new structure on property which replaces a prior structure of a <br />similar use what was located on the same property and which was connected to the South Bend Municipal Water <br />Works, no system development charge will be collected. For instance, if the prior structure was a single family structure <br />and the new structure is to be used as a multi-family structure, a system development charge, as contemplated herein <br />this section, shall be charged. The Board of Public Works shall make the final determination of whether the new property <br />structure is a similar use to the prior property structure for the purposes of this subsection. <br />Sec. 17-80. - System Development Charge for Water inside and outside City limits. <br />(1) For purposes of this section "ERU" shall be defined as an equivalent residential unit which means a single family <br />residence. For purposes of customers that are not single family residences, one (1) ERU shall equal estimated water flows <br />of three hundred ten (310) gallons per day. No customer will be less than one (1) ERU. There will be no partial ERU's. The <br />City shall round down to the closest applicable ERU calculation at all times.
The URL can be used to link to this page
Your browser does not support the video tag.