Laserfiche WebLink
WEAVER BOOS CONSULTANTS, LLC <br />ANNUAL FEE SCHEDULE - PROFESSIONAL SERVICES <br />(Effective October 1, 2008) <br />11, PROFESSIONAL STAFF <br />U.S. $ <br />a) Principal /Corporate Consultant ......................................................... ............................... <br />Hr <br />175.00 <br />b) Project Director ........................ • -- ........,.......,........,................. ..,..,.........,............... <br />Hr <br />155.00 <br />c) Son !or Project Managen ....................................................................... ............................... <br />Hr <br />134.00 <br />d) Senior Project EngineedSoientist ....................................................... ............................... <br />Hr <br />124.00 <br />e) ProjectManagcr .................................................................................. ............................... <br />Hr <br />113.00 <br />1 Project Engineer/ScientistTnvironmental Specialist .......................... ............................... <br />Hr <br />98.00 <br />g) Staff Engineer /Scientist/Environmental Specialist ............................. ............................... <br />Hr <br />88.00 <br />h) Engineer/Scientist/Euvironmental Specialist ...................................... ............................... <br />Hr <br />72.00 <br />II. TECHNICAL STAFF <br />ice$ <br />a} Union Engineering Technician- Journeyman ...................................... ............................... <br />Hr <br />93.00 <br />b) Union Engineering Technician ........................................................... ............................... <br />Hr <br />88.00 <br />c) Construcdo , Superiu tondent .............................................................. ............................... <br />Hr <br />88,00 <br />d) Construction Manager ........................................................................ ............................... <br />Hr <br />77.00 <br />e) System Specialist ................................................................................ ............................... <br />Hr <br />72.00 <br />t) System Technician ............................... - -... • •..._.... •.. - .............. .....1..............- ........ <br />Hr <br />67.00 <br />g) Certified Technician .......................................................................... ............................... <br />13e <br />62.00 <br />Senior -Engineering Technician .......................................................... ............................... <br />Hr <br />57.00 <br />i) Engineering Technician H .................................................................. ............................... <br />Hr <br />52.00 <br />j) Engineer• hrgTechnicianI. .................................... ............................... ..1.......................111.. <br />Hr <br />41.00 <br />111. SUPPORT STAFF <br />U.S. $ <br />a) CAD Designer 111 ............................................................................... ............................... <br />Hr <br />88.00 <br />b) CAD Designer If -- --- ......... ................................................. ............................... <br />Hr <br />77.00 <br />c) CAD Designer ................................................................................. ............................... <br />Hr <br />57.00 <br />d) Technical Assistant.. ................ ......................................................................................... <br />Hr <br />52.00 <br />e) ClericaMord Processing................................................................... ............................... <br />Hr <br />52.00 <br />W. GENERAL EXPENSES <br />a) Automobile Transportation ...... --- .................................................. ............................... <br />Mi. <br />0.75 <br />bSubcontract Service or Rental............ - ........................................... ............................... <br />Cost+ <br />15% <br />c Repot Preparation (outside services) ........................... .....-............................................ <br />Cost <br />+15% <br />d Outside Services <br />(e.g. photographer, film processing, overnight delivery, etc.) .......................... 1..,111...,,... <br />Cost+ <br />15% <br />e) Per Diem (food and lodging) ........................ .... .................. .................................. ............ <br />$1201day <br />flPer Diem (no lodging) ........................................................................ ............................... <br />$30 /day <br />g) Transportation by Commercial Carrier or Rental Car,..... .................. ............................... <br />Cost+15% <br />h) Travel Expenses ................................................................................. ............................... <br />Cost <br />+15% <br />UN[T PRICE NOTES: <br />1. All professional, technical, and support stalftime, and expenses spent in furateranco of the climfs work will be billed. This includes, <br />but is not limited to, proposal. Met, travel, research, reelmicol review and reporting, project management, client meeting, and pmjeLt- <br />specific administrative time and expenses. <br />2, An overtime rate of l.3 times the regular rate is billed for mclnicsl and support stiff services for work in exooss of 40 hours per week, <br />work between 7:00 p,m. to 5:00 am -, and work on Saturdays, This overtone rate is increased to 2,0 flints the regular rate for work on <br />Sundays and holidays. <br />3. Unless otherwise agreed to In writing, a monthly interest charge of 18% per annum, will be charged aceroing tom the dale of invoice, <br />on all invoices not paid within 30 days. <br />4. The unit rates are subject to periodic modification (typically annually). These nut modifica[ions will be incorporated into long -term <br />projects, worts otherwise addressed in the project contract. <br />5. Deposition and testimony services are charged at 1.5 times the regular billing we <br />GENERAL 6XI'ENSE NOTES: <br />r. Rates quoted are for expenses only, equipment purchased on the client's behalf is marked up 25% <br />I Personnel rates ere billed separately from Fermat expenses. <br />3. Standard non -disposable protective outer -wear or equipment damaged or contaminated by site conditions are billed at replacement cost <br />plus 15%, <br />_. General expense made -ups may be negotiated based upon connect size and payment terms. <br />5. The per diem rates set forth above am the standard rates we typically use for oil[ (ethnical staff on projects. We reserve the right ro <br />modify these rates in high cost areas. <br />,& Mileage rate is based on gasoline price or S3.6o per gallon- A foe[ surcharge may be added if traditions beyond Weaver naps <br />Coneultaors North Central, LLC control warrants it <br />ARV modification to dlfs fee selredare regrtires the wriltea apy'oual ofWeapu Boas Cooserllanls, LLC <br />0.1fgM5Wapma7Wmehmenn _LLCToSthMulAWBCNCPw SdWul-ow.m,doe Pape 1 or2 <br />