Laserfiche WebLink
Rieth-Riley Construction Co., Inc. <br />MATERIAL 109.05 (b)(3) <br />Monutactured <br />Dewription <br />Quantity <br />Unit <br />Unit Price <br />Extonction <br />$ <br />S <br />$ <br />S <br />3 <br />S <br />$ <br />S <br />$ <br />$ <br />S <br />S <br />MATERIALS PURCHASED <br />MATERIALS MANUFACTURED <br />TOTAL: LINE(18)+(19) <br />12 % x LINE (20) <br />GRAND TOTAL FOR MATERIALS. LINE (20) � (21) <br />EQUIPMENT 109.05 (b)(4) <br />$0.00 (18) <br />$0.00 (19) <br />$0.00 (20) <br />$0.00 (21) <br />$0.00 (22) <br />F_quipmont8 <br />CONTRACTOR OWNED EQUIPMENT <br />FHWA HOURLY RATE <br />HOURS <br />EXTENSION <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0,00 <br />$0.00 <br />$0,00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Trucking - Striaght Time <br />$0.00 <br />Trucking . Over Time <br />$0.00 <br />Trucking. Douala Time <br />D. <br />TOTAL EQUIPMENT <br />$0.00 (23) <br />TOTAL TRUCKING - <br />n-w (24) <br />FUEL, LUBRICANTS AND TRANSPORTATION COSTS <br />(25) <br />TOTAL LINES (23) + (24) + (25) <br />,� (26) <br />12 % x LINE (26) <br />$0.0 (27) <br />GRAND TOTAL FOR EQUIPMENT: LINES (26)+ (27) <br />n-W (28) <br />SUBCONTRACTORS 109.05 (b)(6) <br />TOTAL SUBCONTRACT WEEK ENDING $3,847.65 (29) <br />7 %x LINE (30) $269.34 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: UNES (30) + (31) + (32) $4,116.99 (33) <br />Irr.�c��rrv�c� c.�.r„nr�ir��rrrealf:rxlna�a <br />TOTAL UNES (12). (17), (22), (28) b (33) <br />$4,116.99 <br />(34) <br />1.1 %OF BOND RATE BASED UPON LINE (34) <br />$45.29 <br />(35) <br />10 % x LINE (35) <br />$4.53 <br />(38) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) <br />$4,166.80 <br />137) <br />Page 2 of 2 <br />