My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 4 & 5 - Corby, Ironwood, Rockne Intersection Improvements - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order Nos 4 & 5 - Corby, Ironwood, Rockne Intersection Improvements - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:19:08 PM
Creation date
11/12/2020 11:25:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MATERIAL 109.05 (b)(3) <br />Purchased or <br />Manufactured <br />Descnption <br />Quantity <br />Unit <br />Unit Price <br />Extenslion <br />$ 240.00 <br />S <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />s <br />MATERIALS PURCHASED <br />MATERIALS MANUFACTURED <br />TOTAL: LINE (18) + (19) <br />12 % x LINE (20) <br />GRAND TOTAL FOR MATERIALS: LINE (20) + (21) <br />EQUIPMENT 109.05 (b)(4) <br />$0.00 (18) <br />$0.00 (19) <br />$0.00 (20) <br />$0.00 (21) <br />$0.00 (22) <br />Equipment k <br />CONTRACTOR OWNED EQUIPMENT <br />FHWA HOURLY RATE <br />HOURS <br />EXTENSION <br />$0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Trucking - Striaght Time <br />$0.00 <br />S 0.00 <br />Trucking - Over Time <br />$0.00 <br />$0.00 <br />Trucking - Double Time <br />$0,00 <br />50.00 <br />SUBCONTRACTORS 109.05 (b)(6) <br />Install Tunnel Visors <br />TOTAL EQUIPMENT <br />$0.00 <br />(23) <br />TOTAL TRUCKING <br />$0.00 <br />(24) <br />FUEL, LUBRICANTS AND TRANSPORTATION COSTS <br />$0.00 <br />(25) <br />TOTAL LINES (23) + (24) + (25) <br />$0.00 <br />(26) <br />12 % x LINE (26) <br />$0.00 <br />(27) <br />GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) <br />$0.00 <br />(28) <br />TOTAL SUBCONTRACT WEEK ENDING $521.90 (29) <br />7 % x LINE (30) $36.53 (31) <br />$0.00 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $558.43 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17), (22). (28) & (33) $558.43 (34) <br />1.i % OF BOND RATE BASED UPON LINE (341 $6.14 (35) <br />10 % x LINE (35) $0.61 (36) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) $565.19 (37) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.