My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amend Construction Standards and Specifications - Section 8, Landscaping, Section 9, Fixtures and Finishes, per Resolution No. 31-2018
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amend Construction Standards and Specifications - Section 8, Landscaping, Section 9, Fixtures and Finishes, per Resolution No. 31-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:35:47 AM
Creation date
10/14/2020 3:43:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 8 — LANDSCAPING <br />8-2.7 STRUCTURAL SOIL <br />Structural Soil shall provide a layer suitable for supporting the growth of permanent vegetation. All <br />materials shall be obtained from the existing soils within the construction limits, an approved <br />commercial source, or project -specific borrow pits. The Structural Soil shall be a fertile, friable and <br />loamy soil of uniform quality free from any objectionable plant material or undesirable vegetative <br />debris which would be harmful to plant life. All landscape shrub beds and tree pits within paved areas <br />shall be backfilled with a Structural Soil mix as further described below. <br />• All materials used to develop the Structural Soil shall consist of 40-45% sand, 7-20% clay, <br />and 35-40% silt and must be placed at the depth of the tree root ball at a minimum depth of <br />24 inches. <br />• All components and amendments to the Structural Soil shall be added and mixed with <br />pulverized topsoil and prepared offsite at the supplier's facility creating a uniform mix. <br />Structural Soil shall be installed uniformly in grassed parkway locations and urban <br />environments as may be necessary for the viability of trees and other landscape amenities. <br />Structural Fill shall be stored in stockpiles at the producer's or supplier's facility and be protected from <br />erosion, absorption of excess water, and contamination at all times. <br />8-2.8 TREE GRATES <br />The size and location of Tree Grates shall be in accordance with the tree species size classes listed in <br />the tii t,' Lee i ;as t.er V!J a.n1t.'!M,u;;,ist. and ct 2il 2 „L)... All tree grates shall be installed with a metal <br />frame, such as angle iron, on which the grate will rest. At all tree grate locations, a water percolation <br />test shall be conducted to ensure not standing water is present within planting beds for greater than 12 <br />hours. If proper drainage cannot be achieved, underdrains are to be provided where standing water <br />will restrict healthy plant growth. <br />8-3 MAINTENANCE AND WARRANTY <br />All vegetative features, where applied, shall be warranted for a period not less than 2 growing seasons <br />from project completion. During the warranty inspection period, planting areas will be rated per the <br />following scale: <br />Good: 81-100% of foliage, no major structural defects, no insect or disease concern, <br />high vigor <br />Fair: 66-80% of foliage, minor structural defects, minor insect or disease concern, <br />medium vigor <br />Poor: 26-65% of foliage, major structural defects, mechanical damage, insect or <br />disease noticeable decline, poor vigor— remediation plan and action required <br />Dead: 0-25% of foliage— replacement required <br />Areas rated as "poor" will require a remediation plan and action. Areas rated as "dead" will require <br />replacement. <br />95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.