My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - F.A. Wilhelm Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - F.A. Wilhelm Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 1:02:02 PM
Creation date
10/14/2020 1:01:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FNQPXFSJOH!QFPQMF!UP <br />CVJME!!XIBU!NBUUFST <br />Nffujoh!Njovuft <br />CITIZENS RESERVOIR <br />Coordination Meeting Minutes <br />th <br />May 7, 2020 <br /> <br />Safety Minute <br /> <br /> CoronaVirus – signage postings around the site, if you’re feeling ill stay home <br />and notify supervisor, keep work area clean and sanitized <br /> Scott- Citizens projects have been voluntary use of respirators, More <br />signage to post on site, refill on hand sanitizer if possible to help keep <br />sanitized, clean community shared tools, equipment, and vehicles <br /> <br /> Fire/Welding Safety and Precautions- Fire extinguisher check and fire watch <br />training, Proper PPE, Welding screens to protect surrounding public <br /> <br /> Excavations- Proper benching and sloping soil, orange fence blocking off <br />open excavation, daily excavation inspection <br /> <br /> Severe weather- Updated action plans with contacts and muster points, <br />properly secure all stored materials <br /> <br /> <br />Reynolds – Geotechnical Package <br /> <br /> Vertical Shafts <br /> Miller Raised Bore ( 20FT +/-) <br /> Form and Pour Concrete Liner & Weir Wall <br />rd <br /> 3 Pour @ 12:30 5/7/20 <br /> <br /> Tunnels <br /> Pump Tunnel invert <br />st <br /> 1 Pour 5/8/20 (100FT+/-) <br /> Pump Tunnel shotcrete to follow tunnel invert- tentative week of <br />5/18/20 <br /> Intake tunnel inspection video and rock bolt inspection- Tentative <br />5/18/20 <br /> <br />Pump Building – Surface Facility <br /> <br /> Nicholson Production Piles <br /> Completed 5/7/20 <br /> FAW <br /> Deep Sump Pit Excavation Start 5/8/20 <br /> Grade Beam Installation Start 5/14/20 <br /> Miller-Eads Electrical & Watt Mechanical <br />Djuz!pg!Tpvui!Cfoe!}!G/B/!Xjmifmn!Dpotusvdujpo}!Qjolippl!XUQ!Jnqspwfnfout!Qspkfdu!.!SGR!Hvjefmjoft <br />4: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.