Laserfiche WebLink
I 1� 11 ir <br />rJ10111 1! 1 �!IA <br />Engineering • Architecture • Land Surveyinc <br />AUDUBON WOODS - SECTION 2 <br />19-0552 <br />Water Main Construction Cost Estimate <br />September 1, 2020 <br />Description <br />Quantity Unit <br />Unit Price <br />Cost <br />1. <br />Construction Engineering <br />1 LS <br />1.5% <br />$2,663 <br />2. <br />Mobilization/Demobilization <br />1 LS <br />5.0% <br />$8,876 <br />3. <br />MOT <br />1 LS <br />$ <br />1,000.00 <br />$1,000 <br />4. <br />Watermain Testing <br />1 LS <br />$ <br />850.00 <br />$850 <br />5. <br />Restoration <br />1 LS <br />$ <br />2,250.00 <br />$2,250 <br />6. <br />Erosion Control <br />1 LS <br />$5,000.00 <br />$5,000 <br />7. <br />Water Main, 8" <br />1,085 LFT <br />$55.00 <br />$59,675 <br />8. <br />Water Service, 1" <br />25 EA <br />$1,500.00 <br />$37,500 <br />9. <br />Fire Hydrant Assembly <br />3 EA <br />$3,250.00 <br />$9,750 <br />10. <br />Concrete Curb & Gutter <br />1,100 Ift <br />$ <br />17.00 <br />$18,700 <br />11. <br />6" Compacted Aggregate <br />200 TON <br />$ <br />25.00 <br />$5,000 <br />12. <br />HMA Patching <br />252 TON <br />$ <br />150.00 <br />$37,800 <br />Subtotal <br />TOTAL: $189,064 <br />As-Builts 1 $5,000.00 $5,000 <br />Notes - <br />TOTAL: $194,064 <br />HMA Patching Includes Removals, 3.5" HMA Base, 2" <br />HMA Intermediate and 1.5" HMA Surface for a 5' wide <br />trench over the water main. HMA to meet already <br />APPROVED St. Joseph County Roadway Plans and <br />Specifications. <br />Fire hydrant ASSEMBLY includes all valves, 6" pipe and <br />fittings for hydrant installation. Watermain Includes all <br />fittings and valves necessary for installation. <br />Page 1 of 1 <br />