Laserfiche WebLink
BID PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: PROJECT NO. 120 012 ound 1 . x <br />s <br />��, <br />FOR BIDS DUE: Jul 28 2020 9:30 am 4 <br />ut t <br />PlnMdk y <br />CONTRACTOR NAME: Walsh & Kelp+, Inc. <br />Division 1: Monroe St. (Michigan St to Lincolnway East) <br />.............Item <br />�....._.. .... <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />No. <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />15,400.00 <br />$15,400.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />5,518.05 <br />$5,518.05 <br />3 <br />Milling, Up to 3" <br />14910 <br />SY <br />2.50 <br />$37,275.00 <br />4 <br />HMA Surface, 9.5 mm-Type B <br />2460 <br />TONS <br />65.20 <br />$160,392.00 <br />5 <br />HMA Wedge and Leveling -Type B <br />369 <br />TONS <br />66.00 <br />$24,354.00 <br />6 <br />HMA for Patching <br />205 <br />TONS <br />125.00 <br />$25,625.00 <br />7 <br />Tack Coat <br />5 <br />TONS <br />1.00 <br />$5.00 <br />8 <br />Joint Adhesive, Surface <br />1780 <br />LF <br />10.00 <br />$17,800.00 <br />9 <br />Adjust Manhole to Grade <br />28 <br />EA <br />740.00 <br />$20,720.00 <br />Adjust Water Valve Structure to Grade <br />- __ <br />_._................... <br />10 <br />12 <br />EA <br />80.00 <br />$960.00 <br />_ __....� ... _.._.... <br />Pavement Message Markings, <br />_........ ...... <br />......� <br />Thermoplastic, White, Lane <br />110.00 <br />$1,870.00 <br />11 <br />Indication Arrow <br />17 <br />EA <br />Pavement Message Markings, <br />............... <br />_ ........ <br />_.._ _........ <br />12 <br />',Thermoplastic, White, "Only" <br />2 <br />EA <br />125.00 <br />$250.00 <br />13 <br />Line, Thermoplastic, Solid, White, 4" <br />236 <br />LF <br />0.60 <br />$141.60 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />