My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oshkosh Corporation Classification - Restricted <br />Defrosting <br />Defroster testing was performed in accordance with SAE J381 Windshield Defrosting Systems <br />Test Procedure and Performance Requirements -Trucks, Buses, and Multipurpose Vehicles. <br />This SAE Recommended Practice establishes uniform test procedures and performance <br />requirements for the defrosting system of enclosed cab trucks, buses, and multipurpose <br />vehicles. Current engineering practice prescribes that for laboratory evaluation of defroster <br />systems, an ice coating of known thickness be applied to the windshield and left- and right- <br />hand side windows to provide more uniform and repeatable test results, even though under <br />actual conditions such a coating would necessarily be scraped off before driving. The test <br />condition, therefore, represents a more severe condition than the actual condition, where the <br />defroster system must merely be capable of maintaining a cleared viewing area. <br />During the test, the vehicle is cold soaked to 0° F in a cold chamber. A prescribed layer of ice <br />is applied to the windshield. The defroster is then run, and the advancing melt boundary <br />marked as the test proceeds. <br />The SAE prescribed area of the windshield was 100% cleared and the side windows were <br />75% cleared within the specified 30-minute period. <br />Defrost Results <br />Start of Test 15 Minutes 30 Minutes <br />Right Viewed From Outside Left <br />CDO167 Saber ER - Enforcer Air Conditioning Defrost 290420.doc 2 4/28/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.