Laserfiche WebLink
WATER TANK WARRANTY <br />A UPF poly water tank limited warranty certificate, WA0195, is included with this proposal. <br />TEN (10) YEAR STRUCTURAL INTEGRITY <br />The Pierce apparatus body limited warranty certificate, WA0009, is included with this proposal. <br />ROLL UP DOOR MATERIAL AND WORKMANSHIP WARRANTY <br />An AMDOR roll -up door limited warranty will be provided. The roll -up door will be warranted against <br />manufacturing defects for a period of ten (10) years. A five (6) year limited warranty will be provided <br />on painted roll up doors. <br />The -limited warranty certificate, WA0185, is included with this proposal. <br />PUMP WARRANTY <br />The Waterous pump will be provided with a Seven (7) year material and workmanship limited warranty. <br />A copy of the warranty certificate will be submitted with the bid package (no exception). <br />TEN (10) YEAR PUMP PLUMBING WARRANTY <br />The Pierce apparatus plumbing limited warranty certificate, WA0035, is included with this proposal. <br />12 YEAR PRO -RATED PAINT AND CORROSION <br />A Pierce stainless steel body limited pro -rated paint warranty certificate, WA0058, is included with this <br />proposal <br />ONE (1) YEAR MATERIAL AND WORKMANSHIP <br />The Pierce traditional gold leaf limited warranty limited warranty certificate, WA0169, is included with <br />this proposal. <br />VEHICLE STABILITY CERTIFICATION <br />The fire apparatus manufacturer will provide a certification stating the apparatus complies with NFPA <br />1901, current edition, section 4.13, Vehicle Stability. The certification will be provided at the time of bid. <br />ENGINE INSTALLATION CERTIFICATION <br />The fire apparatus manufacturer will provide a certification, along with a letter from the engine <br />manufacturer stating they approve of the engine installation in the bidder's chassis. The certification <br />will be provided at the time of delivery. <br />POWER STEERING CERTIFICATION <br />The fire apparatus manufacturer will provide a certification stating the power steering system as <br />installed meets the requirements of the component supplier. The certification will be provided at the <br />time of bid. <br />CAB INTEGRITY CERTIFICATION <br />The fire apparatus manufacturer will provide a cab crash test certification with this proposal. The <br />certification will state that a specimen representing the substantial structural configuration of the cab <br />has been tested and certified by an independent third party test facility. Testing events will be <br />documented with photographs, real-time and high-speed video, vehicle accelerometers, cart <br />86 of 89 <br />