My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HYDRAULIC LADDER RACK DEPLOYED LIGHTS <br />There will be two (2) Truck-Lite catalog number 15***, 1.20" high x 2.49" wide x 0.94" deep lights with <br />chrome trim, amber flashing LEDs and,provided per the following: <br />• One (1) light installed on the front of the hydraulic ladder rack <br />• One (1) light installed on the rear of the hydraulic ladder rack <br />• The warning light lens colors to -be the same as the LEDs <br />The lights will be activated when the battery switch is on and the hydraulic ladder rack is not in the <br />stowed position. <br />FOLDING LADDER <br />One (1) 10.00' aluminum, Series 585-A, Duo -Safety folding ladder will be installed on the right side <br />hydraulic ladder rack. <br />PIKE POLE PROVIDED BY FIRE DEPARTMENT <br />NFPA 1901, 2016 edition, Section 5.9.4 requires one (1) 8 ft or longer pike pole mounted in a bracket <br />fastened to the apparatus. <br />The pike pole is not on the apparatus as manufactured. The fire department will provide and mount the <br />pike pole. <br />The pike pole(s) will be a Duo -Safety 10' pike pole. <br />W PIKE POLE PROVIDED BY FIRE DEPARTMENT <br />NFPA 1901, 2016 edition, Section 5.9.4 requires one (1) 6' pike pole or plaster hook mounted in a <br />bracket fastened to the• rpparatu& - <br />The pike pole is not on the apparatus as manufactured. The fire department will provide and mount the <br />pike pole. <br />The pike pole(s) will be a Duo -Safety 6' pike pole. <br />SLIDE -OUT PLATFORM <br />Two (2) slideout platforms will be provided tbd under body. The capacity rating will be 500 Ibs in the <br />extended position. Automatic locks will be provided for both the "in" and "out" positions. The trip <br />mechanism for the locks will be located at the front of the tray for ease of use with a gloved hand. <br />There will be a TecNiq, Model T10-1-000-1, 15.00" white 12 volt DC LED light provided to illuminate the <br />ground area. <br />REAR MOUNT FIRE PUMP <br />Rear mount fire pump will be a Waterous S100D, 1500 gpm, single (1) stage centrifugal type. The <br />pump will be an end suction, pedestal mount, single inlet type. <br />Pump will be the class "A" type. <br />Pump will deliver the percentage of rated discharge at pressures,4ndi.. ated beow: <br />64 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.