My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2018
>
July 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 2:27:21 PM
Creation date
6/8/2020 10:18:47 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2012-1219 approved removal of two chimneys due to deterioration; chimneys to be reconstructed at a later date as <br />part of a roofing project (materials stored on site). COA 2014-0401 approved a re -roof of the carriage house; repair <br />of gutters and downspouts; removal of scrub trees on property and one maple in tree lawn to restore original is <br />landscaping; removal of non-contributing/non-original picture windows and replace with wood replicating garage <br />door pattern until permanent solution found. RME 2014-0917 approved a complete tear -off and re -roof of the <br />Carriage House with Highland Slate Designer Shingles. RME 2016-0318A approved re-tuckpointing of exterior; <br />rebuilding of east and west chimneys (re -added 10 courses); removed and replaced asphalt shingles to match <br />carriage house; replace/replicate downspouts, gutters, and copper flashing; remove, repair, and paint all windows. <br />COA 2017-0905D approved the general scope of work including: major landscaping/site work, masonry and floor <br />repair, accessibility, and carriage house under the condition that all final material and specifications will need to <br />come before the HPC. <br />APPLICATION ITEMS: "Repair and repaint trim and stucco of garage, rehabilitate garage double hung sash, <br />new copper gutters and downspouts on garage. Rebuild site by removing all existing concrete and landscaping, <br />regrading and completing new entrance, parking area and landscaping. See attached plans." <br />"Garage <br />Work on exterior as described on Sheet A2.0 attached. Alternate to install copper gutters and downspouts is <br />proposed in lieu of painted galvanized. Work to include repair of damaged trim and stucco in kind, repainting and <br />stripping and staining of wood trim, rehabilitation of existing double hung sash, removal of aluminum and wood <br />storms and associated metal screens, installation of new wood storms. Install new single lite, paneled wood service <br />entrance door to match original that was removed. See photo. <br />Site <br />Remove all existing concrete, landscaping and lawns. Regrade site and install new entrance drive and parking lot <br />area in concrete excepting drive from W. Washington sidewalk through Port Cochere to parking area which will be <br />constructed in compacted crushed fine limestone. Install new landscaping. • <br />Specifically: <br />1. Undertake all work as outlined in C1.0 <br />2. Undertake work as outlined in C1.1 except handicapped ramp and any associated work on porches and <br />house related to handicapped access. Such work will be brought forward at a later time for review and <br />approval. No railings on front, rear or side porch will be undertaken at this time. <br />3. Grading and draining as outlined on C1.2 <br />4. Site plan completed as outlined on C1.3, "driveway" from W. Washington Street through Port Cochere <br />proposed to be completed in compacted crushed limestone. Approval is also sought to complete edging <br />along drive in heavy gauge metal steel instead of concrete curbing. This drive will not be used for vehicles. <br />Additional detail sheets (C1.3 and CIA) provided for information on proposed draining and drive installation. <br />All necessary variances and zoning have been secured. <br />Details to bring back for consideration at August meeting or assign to staff for review and approval: <br />Plant list for all new trees <br />Detail for trash enclosure <br />Sign" <br />DESCRIPTION OF PROPOSED PROJECT: See "Minutes of a Meeting of the Historic Preservation <br />Commission of South Bend and St. Joseph County, September 18, 2017, Public Hearing A, 5 COA 2017-0905D". <br />The general scope of work has already been approved and issued an active COA. The purpose of this public hearing <br />is to review final material and specifications. Additionally, many of the application items are Routine Maintenance <br />Exclusions. <br />SITE VISIT REPORT: n/a • <br />STANDARDS AND GUIDELINES: Local Landmarks Group B: <br />
The URL can be used to link to this page
Your browser does not support the video tag.