My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
April 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2018
>
April 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 6:12:49 PM
Creation date
6/8/2020 10:18:33 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C01 STRUCTION METHODS <br />The proposed restoration will be similar to the facade restorations completed in 2017 by the <br />same contractor, Millwood Construction. The existing aluminum siding will be removed, the origi- <br />nal clapboards and existing wood details salvaged where possible, and new western red cedar will be <br />replaced in all locations as necessary. The contractor will restore the existing column drums (six large <br />and four small) and their bases, and reconstruct where necessary. All ten capitals will be replaced, and <br />will be manufactured by Chadsworth Columns (see attached documentation). The pilasters will be re- <br />stored as indicated in the attached drawing to match the restoration completed in 2017 (please see the <br />images below to reference the restoration of the east, north and west facades). The roof, gutters and <br />downspouts will be replaced as well and the cornice restored (please see the documentation included <br />for the Ecostar synthetic slate shingle proposed). <br />129 W North Shwre give during restoration of east, north and west elevations. <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.