My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 2008
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2008
>
February 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:13:27 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001361
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WOOD TILT PACS - ALL <br />TILT PAC FULL SCREEN MEASUREMENTS <br />9-s <br />MARVIN 0 <br />Windows and Doors <br />Made foryou: <br />Screen Opening -s► <br />Instructions: <br />To insure a proper screen fit, it is recommended to order a screen after the Tilt Pac installation. <br />Side Casing <br />1. To find the screen opening height: <br />Measure from the top casing to the edge of where the screen will rest at the sill, minus 3/32" (2) for the outside <br />measurement (OSM) of the screen height. <br />2. To find the screen opening width: <br />Measure from the inside edge of the side casing to theinside edge of the opposite side casing, minus 1/8" (3) for <br />the outside measurement (OSM) of the screen width,. . <br />NOTE: <br />Double Hung sash and screen are shown above. Instructions and measuring locations apply to Single Hung, Magnum <br />Double / Single Hung sash, and Magnum Historical sash. Screen measuring instructions also apply to Combination Storm <br />/ Screen measurements. Standard angle on combination bottom rails is 14 degrees, other angles must be specified. <br />+1'7103 25.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.