Laserfiche WebLink
6.0 PUBLIC REVIEW <br />6.1 This Environmental Assessment will be made available to the public for a 30 -day review <br />period. Following this period and a review of the comments received, a final determination <br />will be made by the District Engineer regarding the necessity of preparing an Environmental <br />Impact Statement (EIS) for the proposed St. Joseph_ Riverbank protection project at South <br />Bend, Indiana. <br />6.2 Based on the conclusions of this Environmental Assessment, it appears that preparation of <br />an EIS will not be required. Therefore, a Preliminary Finding of No Significant Impact <br />(FONSI) is included with this Assessment (Attachment D). If the District Engineer determines <br />that an EIS is not necessary, the Preliminary FONSI would be finalized. <br />ME <br />