Laserfiche WebLink
construction in a floodway (Correspondence, June 9, 2000, Attachment B, Page B-11). They <br />reviewed their Natural Heritage Program data base and found that no species listed on state or <br />federal lists as threatened, endangered, or rare are reported to occur in the project vicinity. The <br />IDNR recommends the project include measures to minimize environmental and aesthetic <br />impacts, such as bioengineering techniques, native glacial stone or logs for bank stabilization, <br />and lunkers or other structures to enhance aquatic habitat. They said, "Do not use heavy <br />equipment in the channel," and requested inclusion of riverbank fishing access in the plans. <br />4.14 Approval for construction in the floodway would be obtained from the IDNR prior to <br />construction. The project is designed to minimize disruption to the environment. The North, <br />Shore Drive protection site has been modified to include a bio -engineered upper bank <br />protection, which will minimize the number of larger trees required to be removed. Project <br />funding, pursuant to Section 14 of the Federal Flood Control Act. of 1946, is specifically for <br />emergency streambank protection and does not allow for funding of amenities such as lunker <br />boxes or A jacks, unless the full added cost is supported by a not federal entity. <br />4.15 Some equipment operation in the riverbed will be necessary because of limited site access <br />and because of load limits on the upper slope at North Shore Drive due to slope instability. In -- <br />water equipment operation will be limited as much as possible to within the area where the <br />riprap will be placed and preference would be given_ to smaller equipment where possible. Any <br />equipment operation or travel on the riverbed outside the excavation area shall be limited to a <br />single path to limit the area directly disturbed. Riverbed travel shall be limited to that <br />necessary for construction. <br />4.16 The IDNR. Division of Historic Preservation and ArchaeoloRv: The IDNR Division of <br />Historic Preservation and Archaeology provided comments on the proposed project pursuant to <br />the National Historic Preservation Act (Correspondence, February.21, 2000, Attachment B, <br />Page B-12). For all three proposed projects and sites, they concur with the Corps' findings that <br />there are no historic properties within the area of potential effects of the project. They request, <br />as specified in 36 C.F.R. 800.11 [d], that once complete, the documentation be made available to <br />the public and all interested parties. Additionally, they requested that if the project scope <br />changes or if artifacts or bones are discovered, that the work stop and their office be notified <br />within 2 days. <br />4.17 Cultural resource identification and evaluation efforts are discussed in this Environmental <br />Assessment, which will be made available federal, state, and local agencies and the general <br />public. Contract specifications will designate that, if during construction the contractor <br />observes unusual items that might have historical, archeological, or cultural value, the - <br />contractor shall protect those items and immediately report the find to the contracting officer so <br />that the IDNR Division of Historic Preservation may be notified. <br />4. i 8 The Indiana Departmetut of Envirotuniental >vianap-eiimit requested the Cops submit a <br />completed application packet for Section 401 water quality certification, including final <br />construction methods, materials, amount of excavation and/or fill, and any re -vegetation plans <br />