My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 2001
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2001
>
July 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:22 PM
Creation date
6/8/2020 10:10:25 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MADISON SCHOOL PROJECT <br />UP DATE REPORT <br />As of the end of June 2001 the following changes have occurred at the Madison School <br />Renovation Site. <br />1) The walls to the addition located on northeast corner of the <br />building are nearing completion. <br />2) Several of the new Pella windows have been installed on the <br />north and south facades. Currently the new windows do not <br />appear to be complete as of yet, all are missing the required <br />mutins and some are missing the center dividing posts. The <br />staff is under the assumption that these will be installed as the <br />- - --- - ---- --- - -- <br />window portion of the project proceeds. However, the staff <br />will watch this part of the project closely and if it appears the <br />installation is complete and mutins are still not installed the <br />architect and school will be notified immediately of the error. <br />So it can be rectified as quickly as possible. <br />3) The courtyard addition foundation is finished and steel framing <br />of both stories has begun. <br />
The URL can be used to link to this page
Your browser does not support the video tag.