My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 1998
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1998
>
February 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:09:12 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 14, 1988 <br />A letter from Mr. Selsor to the Indiana Department of Highways, <br />protesting a variety of requests made,by the Department regarding <br />Mr. Selsor's property. <br />March 16, 1988 <br />HPC staff report citing Additions to Landmarks Standards recommended <br />1. that the siding replacement be vertical <br />2. the brick veneer be deleted from the plan <br />3. the 2nd floor roof line be changed <br />May 16, 1988 <br />The HPC voted to approve the reduction`in size of Mr. Selsor's Landmark <br />property. <br />February 20, 1989 <br />The owner applied for a C of A as follows: 1. add a 1 story addition to <br />the SE corner*of the house. 2. Remove a split rail fence and replace with <br />picket fence; replace entry lantern; landscape change; tree removal; signage. <br />The HPC staff report recommended the approval of all of these items. <br />February 21, 1992 <br />The owner applied for a C of A as follows: 1. to rehabilitate existing <br />wood siding, replace existing wood siding (c.1919) in-kind; 2. build <br />doors to match 1875 elevation, doors fixed in place; 3. replace two <br />existing medallions with round lights; 4. replace existing side openings <br />with same or similar windows; 5. add windows and build air lock at rear <br />elevation; 6. pave rear for parking; each of these proposals applied to <br />the large barn. <br />February 21, 1992 <br />HPC staff report citing Landmark Standards Group B, Treatment, Renovations <br />and Additions to Landmarks, Construction and Style/Materials recommeded <br />complete approval of the proposal. <br />July 28, 1993 <br />Mr. Selsor's lapsed C of A dated February 21, 1992 was re -approved by <br />Commissioner Oxian. <br />February 28, 1994 <br />Mr. Selsor applies for a C of A to build a small storage building on <br />an unregulated parcel of land. The land in question had been previously <br />removed from Landmark status. The HPC informs Mr. Selsor of this fact <br />and offers to return his application fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.