My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December 1998
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1998
>
December 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:09:10 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
framed pictures and minor displays to show their appreciation for the donation of items and to <br />create displays within the building to perpetuate the history of the facility. I was pleased and <br />greatly relieved that we will finally have fire detection ability for the cabin which has been a <br />gamble all of these years, especially when one remembers the former Powell cabin. <br />North Pumping Station Construction Project - It has become very clear that we were never <br />fully informed of the scope of the construction project at the North Pumping Station when the <br />COA was applied for by the Water Works Dept. In fact, we only saw about 95% of the project. <br />In essence the former pumping station will be converted into a filtration and pumping facility. In <br />the course of this conversion the nearly 100% intact interior of this structure will be eliminated. <br />Most interestingly to me was the fact that there was NO mention of the historical context of the <br />structure to be found anywhere in the specifications of the bid package, nor at the pre-bid <br />meeting. This is in sharp contrast to the propaganda being provided by both the Board of Public <br />Works and the Water Works Engineering Depts. The battle on this project is in progress and the <br />attached letter will provide further data on the topic. (See letter) <br />East Bank Interpretive Sign Project -A meeting was held at the Oyster Bar for all of those <br />that are or have been involved in the East Bank Indiana Heritage Grant project, which now has <br />come to the stage where signage is being selected for the walking tours that have been <br />established for that area. There was discussion regarding funds, dues and expenses with those <br />present at the get together, which was reminiscent of college days in the 60's and 70's. In fact <br />about as much was accomplished as in those days. This office is working with the assistant <br />director of the Rum Nature Center in selecting a feasible material to be used for the signs. Garry <br />Harrington (who is the asst. director) and I have met twice since the bar ritual and continue to <br />hone in on a selection. <br />Final Re -Reimbursement (General Assistant Grant) - Paper work and data needed to obtain <br />our final monies for those topics covered in the General Assistance Grant was completed, with <br />some $1900.00 being our final figure. - - <br />Second County Courthouse - Two meeting have been held with the architects from Ken <br />Herceg & Associates regarding the unacceptable lighting placed on the roof of the renovated <br />second courthouse. The meetings and direction for the outcome seem quite favorable. <br />PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.