My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1997
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1997
>
November 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:08:54 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICATE OF APPROPRIATENESS STAFF REPORT <br />APPLICATION -- 1997-1024 <br />• PROPERTY -- Leeper Park <br />South Bend, IN <br />OWNER -- City of South Bend Parks Dept. <br />DESIGNATION -- LL <br />RATING -- Significant S/12 <br />STATEMENT OF SIGNIFICANCE/HISTORIC CONTEXT, <br />In 1895 the City of South Bend purchased a large parcel of land on the east <br />side of Michigan Street for the establishment of the Water Works who located <br />and capped artesian wells there, thus, rendering the land usable for <br />recreation. By 1900 the area around the Water Works had become referred to as <br />Leeper Park. The following year, extensive plans and site development were <br />undertaken. The zoo and lily pond were constructed in 1902. In 1904 the log <br />cabin was moved into the park from 123 West Northshore Drive. This -building <br />was rehabilitated and established as the "Pierre Navarre Cabin. <br />In 1905 additional lands were acquired between Michigan and Lafayette Streets <br />where they developed tennis courts. The following year acreage was added <br />completing the west end of the park and a year after that the connecting <br />wooden bridge was washed away and replaced with a new structure of iron and <br />concrete. By this time the zoo located at the east end of the park boasted <br />132 animals of 50 varieties and the pond in the middle section of the park was <br />stocked with ducks and geese. <br />• In 1911, the Park Board engaged George Kessler of St. Louis for the <br />development of master plan for the City's park -boulevard system. The present <br />North Pumping Station and its reservoir were constructed in 1912. The present <br />Michigan Street Bridge was constructed in 1915 as part of the Park -Boulevard <br />plan proposed by George Kessler. During the Great Depression extensive work <br />was done in the park funded by the Works Progress Administration (WPA) <br />including the reconstruction of the retaining walls around the island which <br />utilized salvage material from the earlier bridge. <br />PROPOSED CHANGE <br />Applicant proposes to place large rocks or posts along Riverside Drive, north <br />from Bartlett to Rose Garden to prevent parking on the grass. The neighbors <br />on Riverside Drive requested this due to defacing of park property caused by <br />parking cars on the grass. One portion of real parking will remain open. <br />STANDARDS <br />The Preservation Guidelines for Local Landmarks state: <br />C.3. Materials <br />Additions and improvements involving any new material in the landmark should <br />be of the same material as the original. An alternative material may be <br />allowed if it duplicates the original. <br />Building Site and Landscaping <br />1. Required <br />Structures such as: gazebos, patio decks .... new walls ....and other similar <br />structures shall be compatible to the historic character of the site and the <br />• neighborhood and inconspicuous when viewed from a public way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.