Laserfiche WebLink
Roof & <br />Replace all missing or damaged slate. Install <br />new <br />• Gutters <br />built-in galvanized gutters with downspouts to <br />match <br />existing �10,pE)O -6- +30DO (DtAe _) <br />OPTION: Remove existing slates & install new <br />"GAF" <br />Timberline asphalt shingles to simulate the original <br />+11)00 <br />slates. Deck over built-in gutters & install <br />fascia <br />+le O <br />hung half round gutters with downspouts <br />p <br />Paint <br />Paint 2 coats on all existing painted surfaces <br />as well <br />as new porch ceiling, downspouts, storm windows <br />& rear <br />fire escape <br />4 4000 <br />Site <br />Cut all trees away from structure at least 15 <br />feet. <br />3DB <br />Work <br />Cut all dead branches from trees. Shape trees <br />as <br />+50p <br />needed. <br />Replace dead maple on Southeast corner of lot <br />• <br />0 <br />Replace dead maple on Northwest corner of lot � SDO <br />Remove dying sugar maple near child's teter-totter. � 3Dp <br />Maple tree at Northwest corner of building is made up <br />of 4 tree trunks. Remove south trunk nearest building <br />& shape remaining tree ito <br />Remove yew on South side of entry drive + 5(f> <br />Remove grass in raised stone flower bed. Plant 20 <br />verigated hosta & day lilies. Add 3" of bark mulch f_35C) <br />-T UF7k L 1 iz, 300 <br />