Laserfiche WebLink
vim.. <br />Mr. John Oxian <br />February 1, 1990 <br />Page 2 <br />A. Habs drawings for- the Vocational, Boilerhouse and Stack <br />buildings. Habs drawings are in final review by the <br />National Park Service, Washington, D.C. and will be <br />submitted as soon as final approval is obtained. <br />B. Historic plaques describing the Vocational Building, <br />Boilerhouse and Stack, and Central High School. <br />C. A "Memorial Wall" made of salvaged masonry from the <br />demolished buildings. <br />D. Restoration of original landscaping and site features on <br />the east, north and south sides of the building. <br />E. Feasibility study to investigate the Vocational Building <br />for use as parking garage, storage building, or <br />mothballed; cost estimates, parking layouts, etc. <br />I am submitting this information prior to requesting a date for a <br />commission meeting to consider the Certificate of Approval. My <br />deadline for requesting a date is February 9, 1990 for the February <br />19 commission meeting. Please let me know as soon as possible if <br />the items submitted in this letter is the required information. <br />Sincerel <br />V <br />Roger D. lsey <br />Project rchitect <br />tk <br />cc: Ron Farrand, South Bend Comm. School Corp. <br />