Laserfiche WebLink
BID PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: <br />2020 Contractor Paving <br />PROJECT NO. <br />FOR BIDS DUE: <br />May 26, 2020 <br />Jf <br />4MACK <br />CONTRACTOR NAME: <br />Walsh & Kell Ina <br />_. <br />*" <br />W <br />ALTERNATE <br />NO. 1 <br />Item <br />.......... <br />No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />24,657.50 <br />$24,657.50 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />10,200.00 <br />$10,200.00 <br />3 <br />Milling, Up to 1.5" <br />12840 <br />SY <br />1.80 <br />$23,112.00 <br />4 <br />HMA Surface, 9.5 mm —Type B, PG 64-28P <br />1059 <br />TONS <br />71.00 <br />$75,189.00 <br />5 <br />HMA Wedge and Leveling —Type B <br />106 <br />TONS <br />70.00 <br />$7,420.00 <br />6 <br />HMA for Patching <br />47 <br />TONS <br />115.00 <br />$5,405.00 <br />7 <br />Tack Coat <br />4 <br />TONS <br />1.00 <br />$4.00 <br />8 <br />Joint Adhesive, Surface <br />3900 <br />LF <br />0.80 <br />$3,120.00 <br />9 <br />Adjust Manhole to Grade <br />12 <br />EA <br />660.00 <br />$7,920.00 <br />10 <br />Line, Thermoplastic, Solid, White, 6" <br />1010 <br />LFT <br />2.25 <br />$2,272.50 <br />11 <br />Concrete, Curb Ramp, Removal <br />20 <br />SYS <br />95.00 <br />$1,900.00 <br />12 <br />Concrete, Curb Ramp, Installation <br />320 <br />SYS <br />140.00 <br />$44,800.00 <br />ALTERNATE NO. 1 TOTAL <br />mmmmµWWuWWWW <br />$206,000.00 <br />Base Bid +Alternate <br />No. 1 Total <br />�.... $1,173,000.00 <br />I'I'm Cointrssts,r <br />must bid ui'i <br />Ik!)uth 111w Base <br />1,3id aind Afteii"nate No ��2 <br />BIDDER: Walsh�_e & Kell; Inc. <br />