Laserfiche WebLink
Construction Costs <br />May, 2019 <br />Intersection Improvement For US 31 g BrictiXieveland Rd <br />Soutb Bend, Indiana <br />Based on Measured Quantities of Preliminary Design <br />BricldCleveland Rd <br />Item No. <br />Description Assume Quantity Unit Unit Cost Extension <br />I <br />Construction Engineering <br />I <br />I <br />LSUM <br />$ 10,200,00 <br />1 $ 10,200 <br />2 <br />Mob/Demob <br />3 <br />1 <br />LSUM <br />$ 30,600.001 <br />$ 30,600 <br />3 <br />Clearing ROW <br />I <br />I <br />LSUM <br />$ 10,200,00 <br />1 $ 10,200 <br />4 <br />ITemporary Erosion Control <br />I <br />I <br />LSUM <br />$ 10,200.00 <br />$ 10,200 <br />5 <br />Common Excavation <br />6656 <br />CYS <br />$ 20,00 <br />$ 133,111 <br />8 <br />IPavement Removal <br />10,256 <br />SYS <br />$ IS.So <br />$ 158,973 <br />6 <br />1 Subgrade Treatment Type 11 <br />19,967 <br />SYS <br />$ 15,00 <br />$ 299,500 <br />7 <br />lCompacted Aggregate No 53 <br />3,419 <br />TON <br />$ 25.00 <br />$ 85,469 <br />8 <br />IPCCP to,, <br />10,256 <br />SYS <br />$ 55,00 <br />$ 564,097 <br />9 <br />1165 lb/Syd, QC/QA-HMA, 2,64, Surface, 12,5 mm <br />330 <br />TON <br />$ 80.00 <br />$ 26,437 <br />10 <br />1275 lb/syd, QC/QA-HMA, 2,64, Intermediate, t9.0 tam <br />551 <br />TON <br />$ 70.00 <br />$ 38554 <br />11 <br />Asphalt to, Twk Coal <br />I <br />TON <br />$ 500,00 <br />$ 500 <br />12 <br />Construction Sign A <br />10 <br />EA <br />$ 140.00 <br />$ 1,400 <br />13 <br />Barricade 111-A <br />too <br />LFT <br />$ 15.00 <br />$ 1,500 <br />14 <br />Barricade Ill-B <br />100 <br />LFT <br />$ 15.00 <br />$ 1,500 <br />15 <br />Maintaining Traffic <br />15 <br />1 <br />LSUM <br />$ 25,500.00 <br />$ 25,500 <br />Subtotal $ 1,397,740 <br />Contingency 20% $ 279,548 <br />Total $ 1,677,300 <br />\\(tg-srv\Projer,ts\projects\PS\INDO-R1 8115-00 US31 Pvmt Desl 383328\Project-info\Estimate\Cost Estimate for 11 5-GI.xlsx <br />L <br />