Construction Costs
<br />May, 2019
<br />Intersection Improvement For US 31 g BrictiXieveland Rd
<br />Soutb Bend, Indiana
<br />Based on Measured Quantities of Preliminary Design
<br />BricldCleveland Rd
<br />Item No.
<br />Description Assume Quantity Unit Unit Cost Extension
<br />I
<br />Construction Engineering
<br />I
<br />I
<br />LSUM
<br />$ 10,200,00
<br />1 $ 10,200
<br />2
<br />Mob/Demob
<br />3
<br />1
<br />LSUM
<br />$ 30,600.001
<br />$ 30,600
<br />3
<br />Clearing ROW
<br />I
<br />I
<br />LSUM
<br />$ 10,200,00
<br />1 $ 10,200
<br />4
<br />ITemporary Erosion Control
<br />I
<br />I
<br />LSUM
<br />$ 10,200.00
<br />$ 10,200
<br />5
<br />Common Excavation
<br />6656
<br />CYS
<br />$ 20,00
<br />$ 133,111
<br />8
<br />IPavement Removal
<br />10,256
<br />SYS
<br />$ IS.So
<br />$ 158,973
<br />6
<br />1 Subgrade Treatment Type 11
<br />19,967
<br />SYS
<br />$ 15,00
<br />$ 299,500
<br />7
<br />lCompacted Aggregate No 53
<br />3,419
<br />TON
<br />$ 25.00
<br />$ 85,469
<br />8
<br />IPCCP to,,
<br />10,256
<br />SYS
<br />$ 55,00
<br />$ 564,097
<br />9
<br />1165 lb/Syd, QC/QA-HMA, 2,64, Surface, 12,5 mm
<br />330
<br />TON
<br />$ 80.00
<br />$ 26,437
<br />10
<br />1275 lb/syd, QC/QA-HMA, 2,64, Intermediate, t9.0 tam
<br />551
<br />TON
<br />$ 70.00
<br />$ 38554
<br />11
<br />Asphalt to, Twk Coal
<br />I
<br />TON
<br />$ 500,00
<br />$ 500
<br />12
<br />Construction Sign A
<br />10
<br />EA
<br />$ 140.00
<br />$ 1,400
<br />13
<br />Barricade 111-A
<br />too
<br />LFT
<br />$ 15.00
<br />$ 1,500
<br />14
<br />Barricade Ill-B
<br />100
<br />LFT
<br />$ 15.00
<br />$ 1,500
<br />15
<br />Maintaining Traffic
<br />15
<br />1
<br />LSUM
<br />$ 25,500.00
<br />$ 25,500
<br />Subtotal $ 1,397,740
<br />Contingency 20% $ 279,548
<br />Total $ 1,677,300