My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Water Treatment Chemicals 2020-2024 - Kemira Water Solutions, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Water Treatment Chemicals 2020-2024 - Kemira Water Solutions, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:01:13 AM
Creation date
4/16/2020 12:59:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Cylinder and Ton Containers to be Tested <br />a) Cylinders (except DOT 3E 1800) and ton containers must be retested at least <br />once in five years (DOT Section 173.34e and Section 173.31 d). <br />h) Cylinders cannot be filled until they tire retested after the five year anniversa'y <br />of the month in which it was tested. Ton containers can be filled until the end of <br />the calendar year during which their five year test is clue. <br />c) Retests are also required after any reheat treatment. In addition, retest any <br />container which shows evidence of weakness at any time, or show a 5 percent or <br />more loss in weight. <br />-vivify-tom <br />a) Cvlinders and ton containers are hydrostatically retested by the hydrostatic <br />expansion method [DOT Section ]73.34 (a) and Section 173.31 (d)J. ffat the <br />time of requalification a container shows a leak or a permanent expansion which <br />exceeds 10% of the total expansion, it must be condemned. <br />a) Records must be kept showing results of the test. Each container must have the <br />test date plainly and permanently stamped into the metal of one head or the <br />chime of each task passing the hydrostatic retest. <br />South, Water Works representative. -location for <br />cylinderchlorine ♦container <br />2. Delivery Locations: <br />Location _...... <br />.... <br />. �ype of Container <br />_ .. <br />Address <br />North Station <br />2 O 0 lb Ton Container <br />830 North Michigan Street <br />CirriCarriage Hills <br />.......... _._ <br />150 lb Cylinder <br />......�.......... <br />52290 Shenandoah Drive <br />Erskine _ <br />_ w....... <br />150 lb Cylinder <br />- ... _ ... <br />4116 South Fellows Street <br />South <br />2,000 lb. Ton Container <br />3600 South Main Street <br />Cleveland South <br />b <br />1501 Cylinder <br />4900 Cleveland Road <br />Cleveland North <br />� <br />b ylinder <br />1501 C_ m <br />494Cleveland Road <br />9 d <br />m_ <br />Waste Water <br />2,000 lb. Ton Container <br />_....-__.__.. <br />3113 Riverside Drive <br />3. Vendor personnel shall conduct all activities related to the loading and <br />unloading of cylinders. <br />4. Ton containers will need to be delivered with a cherry picker. <br />5. Minimum deliveries are one (1) ton containers and twelve (12) 150# <br />cylinders. <br />6. Supplier must be able to guarantee delivery within 3 to 4 calendar days after <br />order placement <br />7. Vendor personnel shall not unload any filled cylinders or ton containers prior <br />to live inspection by South Bend Water Works Personnel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.