My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Water Treatment Chemicals 2020-2024 - Hawkins, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Water Treatment Chemicals 2020-2024 - Hawkins, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 7:58:52 AM
Creation date
4/16/2020 12:54:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7=77747,7, ! Z, 47TfV7RTX7'II9 Mv. �. I <br />M��= � <br />a) Chlorine ton container types must comply with DOTspec. 106A50OX DOT or <br />ICC106A500, 27, BE27. <br />b) Ton Container Valve and Fuse Plug Opening Areads <br />c) The threads in new ton containers are 314-14NGT (Q). <br />a) Yhe cylinder and ton container vahw are protected during shipment and storage <br />by a removable steel valveprotective housing or cap. Pressure mfiefdevices <br />shall not be covered by the homing. <br />1. Cylinder Stampi�g <br />MAjeffolMi, 0 1 0 A. <br />== 011 <br />a) When mantfictured. ton containers are stamped with DOT specification nunibgr. <br />material, serial number, inspector's official mark name, mark or initials of <br />companyfor whose use the tank is made, (or builder's symbol and serial <br />number), date of Wand water capacity [DOTSecdon 179.300-181. Tare <br />weights may be stamped by builder. Changes in stamping must be made in <br />compliance with DOT'Section 173.31(d) or 49CFR <br />Ili IU�:k ti r;�ll r ,F� <br />Retested cylindiers [DOT 49 CPX Section 173.34 (e)(6)] and ton containers <br />[DOT 49 Mt Section 173.31(d)(7)] must be stamped toshow date of retest <br />For cylinders, the stamp must include the testfacifity's certification number in a <br />pracribedpattern. Ton containers it not require the testfacty's number on <br />the container. <br />4. Tare -Weight Stamping <br />a) It is recommended that all new chlorine cylinders and ton containers be stamped <br />with the original Wre weight by the container manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.