Laserfiche WebLink
1 / (except DOT 3E 1800) and ton containersbe r at least <br />owe infive yearsâ–ş.I r and Section <br />b) Cylinders cannot befilkd until they are retested after thefive year anniversary <br />of the month in which it was tested. Ton containers can befilled until the end of <br />the calendar during which theirfive yearA <br />Retests are also required after any reheat`f addition,any <br />container which shows eWdence ofweabms at any time, or show a 5 percent or <br />more loss <br />E). Cylinders and ton containers are hydrostaticalty retested by the hydrostatic <br />cepansion method [DOT Section 173.34 (a) and Section 173.31 (d)]. Ifatthe <br />time ofrequalification a container shows a leak or a permanent expansion which <br />exceeib 10% ofthe total expansion, it must be condemned. <br />A Recordsbe `AshowingRthe ka.Each F / have tha <br />test /Y.t^ plainty andpermanendy stamped into the metalof one 'hear 1.". the <br />chime of ach laskpassing hydrostatic retest. <br />I - A South Bead Water Works representative shall specify the location for <br />chlorm cylinder, ton container deliveries. <br />2. Delivery Locations: <br />I Vendor personnel shall conduct all activities related to the loading and <br />unloading of cylinders. <br />a Ton containersneed to be delivered with a cherrypicker. <br />5. Minimum deliveries are one (1) ton containers and twelve (12) 150# <br />cyiinders. <br />6. Supplier must be able to guarantee delivery within 3 to 4 calendar days after <br />order placernent <br />7. Vendor personnel shall not unload any Mod cylinders or ton containers prior <br />to live inspection by South Bend Water Works Personnel. <br />