Laserfiche WebLink
South Bend Redevelopment Commission <br />Reschedule4 Regular Meeting - November 17, 1989 <br />6. <br />7. <br />8. <br />(Cont.) <br />j. continued... <br />k. <br />und eYwrite the hiring of our own engineer <br />in the Department of Engineering because <br />of the heavy engineering workload <br />urciects in the 1990 bond issue will <br />Upon a motion by Mr. Piasecki, seconded <br />by Ms. Auburn and unanimously carried, <br />the Commission approved Resolution No. <br />90C authorizing reimbursement to the City <br />of South Bend for expenditures made <br />wit4in the Rum Village Industrial Park. <br />. Kolata informed the Coammission that <br />th outlet mall which was expected to <br />loc ate in the Brick,/olive Econarnic <br />Do elopment Area will not be locating <br />thEre. The developer notified Mayor <br />Keinan that they have had a complete <br />change of corporate policy relating to <br />hcr,A, they select their sites. This came <br />as a ccuplete surprise to the staff. <br />Moot of the documents were finalized and <br />ready to be signed when we received this <br />We have expressed our regrets to <br />th . We thought the location was good <br />aro that the project would do extremely <br />1. The area will remain as an <br />economic ' development tax increment <br />financing area, but we will not be <br />capturing the increment unless there is a <br />Drc iect there. <br />There ufere no progress reports. <br />The Commission cancelled its next Regular <br />Meeting scheduled for November 22. The next <br />Regular Meeting of the Coimmissicn is <br />therefore scheduled for Decenlber 8, 1989, at <br />10:00 <br />-26- <br />••' f 1 • • •'' • alb ' ati • • <br />• • 1/ •' I 1 I. � Ia1 <br />• I Wd • a &i*l 0 •- <br />a►�` 1 rI u I <br />.e 1 r . <br />REMPT CN TM S=S OF THE <br />BRIWO= ECONCHIC DEVELOPMENT <br />AREA <br />.. <br />