Laserfiche WebLink
PART II - MONITORING I?EQUIRMENTS <br />Monitoring Frequency <br />1. The following parameters shall be monitored at the frequency and with the sampling type stated <br />below. All measurements, tests, and analyses of the characteristics of water and wastes to which <br />reference is made in this permit shall be conducted using the methods and procedures approved <br />in 40 CFR 136 and amendments thereto, unless otherwise specified in an applicable Categorical <br />Pretreatment Standard. <br />The following parameters shall be monitored at sample sites EW-1-R, EW-2, EW-3, EW-5-R, E3A, RWB16, and <br />RWB23 with the methods and at the frequency stated below: <br />Parameter <br />Sampling Frequency Sampling Type <br />Flow, Monthly (gal) <br />Monthly <br />Continuously <br />B-TEX (ug/L) <br />SemiAnnual <br />Grab <br />Total Oil and Grease (mg/L) <br />SemiAnnual <br />Grab <br />Oil and Grease TPH (mg/L) <br />SemiAnnual <br />Grab <br />pH (SU) _ <br />SemiAnnual <br />Grab <br />Ammonia, nitrogen (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Arsenic (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />BOD5 (mg/L) <br />Once per First Year of Permit Cycle* ! <br />Composite <br />Cadmium (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Chromium (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Closed Cup Flashpoint (Degrees F) <br />j Once per First Year of Permit Cycle* <br />Grab <br />Copper (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Cyanide (mg/L) <br />Once per First Year of Permit Cycle* <br />Grab <br />f Lead (mg/L) <br />j Once per First Year of Permit Cycle* <br />Composite <br />Mercury (mg/L) <br />Once per First Year of Permit Cycle* <br />Grab <br />Nickel (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Organic Priority Pollutants (ug/L) <br />Once per First Year of Permit Cycle* I <br />Grab <br />Phosphorus (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Silver (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />TSS (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />Zinc (mg/L) <br />Once per First Year of Permit Cycle* <br />Composite <br />See Flow Measurement Requirements referenced in Part III - Reporting Requirements. <br />*Once per First Year Permit Cycle: Parameters with this requirement must be monitored within the first yearj 12 <br />months of each permit cycle. Please see Board of Public Works signature page for dates of permit term. <br />Honeywell Groundwater Remediation Industrial Wastewater Discharge Permit page 3 of 39 <br />