My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Pinhook Park Pavilion Improvements Proj No. 118-077B - Larson-Danielson Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 1 - Pinhook Park Pavilion Improvements Proj No. 118-077B - Larson-Danielson Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:53:06 AM
Creation date
3/11/2020 10:52:25 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V � N�h�:u W4GN 'LMWIIb✓1 /GI69fl4 : �m,.rti.✓t flNroJ. .. J19✓ w1 rol H. mri. ii. :DLL"HD Y,Y�Y,tlll n i�(/INdi. <br />IW�� Br a, —� m I` — . �v v �« w��Jl <br />February 14, 2020 <br />To: Rich Boyd <br />Larson Danielson Construction Co., Inc. <br />ry'l�g� �lalu r�'pmb nlm mm�jkm.com <br />Re: Pinhook Park Pavilion Improvements— New piping <br />Per your request, below is our pricing for the above mentioned project. This includes all labor and <br />materials to for the sum of. 6,239 62, <br />Includes: <br />• Demo and reinstall new PVC pipe for <br />drainage of the urinals <br />Remove water lines to get access to <br />drainage and install new where <br />required <br />• New drainage will have to offset into <br />the chase to utilize existing openings <br />since new holes can't be cored <br />Not Included: <br />• Bonds/allowances <br />• Sales Tax <br />If you have any questions, please feel free to contact me. <br />Thank you, <br />�!G%�4QBOrlq't� <br />Phil LaBounty <br />Estimator/Project Manager <br />Once new drainage is offset water lines <br />will need to be reworked <br />• All water lines replaced will be <br />completed with copper pro -press <br />fittings and pipe <br />• All drainage will be completed in PVC <br />• Straight Time Labor <br />• Overtime Labor <br />2310 Toledo Road Elkhart, Indiana 46516 °s, www.griffenph.com <br />umm�FB wrmm Ou:: NNONh 41�Vev�N ndddd�m oPd:"ea l,PomWa'Wxsoo OolOMOW'MX6MN 4,w:Wrcw 4a4G w'v,Wf9tlu94 Vrv'n04Wu�AN' JJ IDmiImVW � uuuu@MNuuu@Ww.ww.wWww^wu�JMlMamoowuu 000 Nutiuo o�mm«blWih'NY.WWid'k�aG <br />Toll Free (866) 344-7602 (574) 295-2440 o FAX (574) 295-2520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.