Laserfiche WebLink
If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit <br />basis, the itemization of the units shall be sho o sepa a attachment. <br />BY .w + <br />(St na(ura) <br />Catherine DudeC Pre i ent <br />(Printed Marne of Person Signing) <br />The above bid is accepted this 6ACCEPTday of pIL, 20 — <br />P y <br />Subject to the following conditions: I U f S J o �i <br />doseph R. Molnar, Member <br />es 1. or u, Oefnb6r <br />--' est: Linda M. Ma in, Cieric <br />Version 4/2/2019 Contractor's Bid for Public Works - 3 <br />