Laserfiche WebLink
Mr. Andrea.!tlexarader <br />I°e&ruag 13, 2020 <br />KERAMIDA Proposal Nee. I'23537 <br />Pape 3 <br />surveyed prior to the next scheduled monitoring event. Costs for disposal of the generated well <br />installation wastes and surveying the wells can be provided by KERAMIDA on request. <br />Task 2: Grou nLiNvater Statistical Analy i <br />It is KERAMIDA's understanding that the groundwater sampling field activities will be performed <br />by the City of South Bend. Following completion of each sampling event (May 2020 and October <br />2020), the City of South Bend will provide the groundwater data to KERAMIDA. <br />KERAMIDA will then evaluate the data to determine whether there is a statistically significant <br />increase over background values for each constituent listed in Section E9, Ground Water <br />Monitoring Requirements of the January 14, 2008 IDEM approval letter. The evaluation will be <br />performed for wells MW-4, MW-5R, MW-7R, MW-8, MW-9R, MW-11, MW-12, MW-13, and two <br />newly installed groundwater monitoring wells. <br />KERAMIDA will use the same statistical program (DUMPStat) and statistical procedures and <br />methodologies used in previous years. The intent of the evaluation is to provide a ninety-five <br />percent (95%) level of confidence to determine if a change in the concentration of a constituent has <br />occurred or if groundwater quality standards have been exceeded, based on the information <br />obtained during sampling, as well as the results of previous sampling events by the City of South <br />Bend. KERAMIDA will follow the guidelines set forth by the IDEM's Analytical Data Deliverable <br />Requirements. <br />KERAMIDA will summarize the results of each statistical evaluation in a semi-annual Statistical <br />Evaluation Report, which will present the results of the statistical evaluation, along with the <br />distribution assumptions. Each report will be submitted to the City of South Bend in draft form for <br />review and comment. Three paper and two electronic copies of the final report will then be <br />submitted to the City of South Bend, who will be responsible for forwarding the document to the <br />IDEM. <br />The estimated cost to complete the scope of work detailed in this proposal is $21,255 as detailed in <br />Table 1 below. All costs will be invoiced on a lump sum basis, with billing concurrent with <br />completion of each item. Other terms and conditions will be in accordance with the attached <br />KERAMIDA Standard Terms and Conditions. <br />Table 1 <br />