My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA – Design Services for Pavement Improvements at Cleveland & Brick Rd. to include Water Main – The Troyer Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA – Design Services for Pavement Improvements at Cleveland & Brick Rd. to include Water Main – The Troyer Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:39:46 AM
Creation date
2/12/2020 9:38:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Appendix Al <br />119-045 Cleveland Rd. /Brick Rd. Pavement Improvement <br />Water Main Relocation <br />WORK ITEM <br />Labor Code <br />Aftowable Billing Rate <br />Investigation <br />Project Management <br />Water Main Relocation Design / ConstrucUon <br />Plans <br />Uniques Special Provision <br />Ouantitie and Estimate <br />INDOT Documentation <br />Coordination w/ INDOT-SB during bid / construction <br />MOnHOWS Subtotal <br />Labor Rate <br />TTG Manhour and Fee Justification <br />January 23, 2020 <br />Director of <br />Civil Engineer <br />Clvll Eng/neer <br />Civil Engineering <br />Civil Engineering <br />Urban Planner <br />Clerical <br />Total Labor <br />Transportation <br />Project Manager <br />Associate <br />Associate <br />T <br />P <br />5 <br />6 <br />6 <br />7 <br />Z <br />CLW <br />Ste han <br />Ethan <br />Frank <br />$ 1500 <br />$1N1,00. <br />$110.00 <br />$100,00 <br />S'OD,00 <br />$10000 <br />S70.00 <br />1 <br />2 <br />3 <br />1 <br />2 <br />12 <br />15 <br />1.5 <br />0.5 <br />2 <br />12 <br />15 <br />1 <br />4 <br />4 <br />0 <br />2 <br />4 <br />0 <br />0,5 <br />1 <br />1 <br />.. <br />1 <br />2 <br />2 <br />....... <br />z <br />5 <br />5.5 <br />13 <br />36 <br />0 <br />0 <br />0 <br />50.5 <br />$150...... <br />$1 t <br />$100 <br />$100 <br />$100 <br />$70 <br />$1 075 <br />$825 <br />$1 6'00 <br />$3,600 <br />so <br />$0...... <br />$0 <br />$7.190 <br />G:\projects\PS\SouthBnd\l8115-10 Brick Pvml-US 31\Admin\Budget\Design-BudgetFW Wer(et Main As Printed: 1/23/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.