Laserfiche WebLink
VII. Revise Table in Item A.1. of Section C2.01 of Exhibit C as follows: <br />Item <br />'__._..._._.�_..... Description <br />Amount <br />Type <br />Design <br />Services; <br />a. <br />Topographic Survey <br />$18,900.00 <br />Lump <br />Sum <br />b. <br />Study and Report Phase <br />$7,500.00 <br />Lump <br />Sum <br />C. <br />12-Hour Traffic Counts <br />$2,400.00 <br />Lump <br />Sum <br />d. <br />Design and Plans for the Two -Way Conversion of Colfax Avenue Including: <br />�) <br />..._.......... ..._._.._.................. <br />Two -Way Conversion of W. Lasalle Avenue, Realignment of W. Lasalle <br />900 <br />$6,.00 <br />Lump <br />Avenue, and Visitor Parking Lot <br />Sum <br />ii <br />Two-WayConversion of Colfax Avenue <br />$7,800.00 <br />Lump <br />Sum <br />iii) <br />Street Improvements along Elm Street <br />$18,100.00 <br />Lump <br />......................._._ <br />Sum <br />iv <br />Redesign of West Colfax Alley Approach <br />g y pp <br />$2,400.00 <br />Lump <br />Sum <br />e. <br />Building Demolition (as directed by Owner) <br />$5,700.00 <br />Lump <br />...................... _........ <br />Sum <br />_._..._uu.. <br />f. <br />Item Deleted <br />$0.00 <br />Lump <br />Sum <br />g' <br />Design and Plans for Intersection Improvements at Colfax Avenue with <br />$10,800.00 <br />Lump <br />Studebaker Street <br />Sum <br />K <br />Landscape Design and Plans (Subconsultant) <br />$50,395.00 <br />Lump <br />Sum <br />i, <br />Utility Coordination <br />$4,900.00 <br />Lump <br />_ <br />Sum <br />Lighting Design - Elm Street from Washington Street to and including <br />g g g clthe <br />�" <br />intersection of Colfax Avenue with Elm Street and the Visitor Parking Lot. <br />$9,400.00 <br />Lump <br />Add pedestrian level lighting along Elm Street from Colfax Avenue to the <br />Sum <br />City Cemetery entrance. n <br />m' <br />k. <br />Installation of Stop Signs and Sidewalk Repair <br />$2,000.00Lump <br />Sum <br />I. <br />Public Information Meeting (up to 3 @ $2,800.00) <br />$8,400.00 <br />Lump <br />�.. ........ <br />Sum <br />M. <br />Bidding, Preconstruction, Monthly Progress Meetings, and Construction <br />.__ ..__.. _ _. <br />$16,100.00 <br />Hourly <br />Phase <br />n' <br />_.. ....... .......... _ _. ........_ <br />Conceptual Intersection Improvement Plan for Intersection of Colfax <br />600 <br />$4,.00 <br />�M ................ <br />Lump <br />Avenue and LaPorte Avenue <br />Sum <br />Design and Plan for Intersection Improvement a <br />g p t Intersection of Colfax <br />Lump <br />o <br />Avenue and LaPorte Avenue <br />$10,400.00 <br />Sum <br />P. <br />LaSalle Alignment Study <br />$3,100.00 <br />Lump <br />Sum <br />q. <br />Pre aration of Conceptual Alignments for West Colfax Alle Approach <br />$4,000.00Lump <br />...... _...0 <br />Sum <br />_ <br />Repackage the Colfax/Studebaker Intersection Design from the 2018 to the <br />....... ...... <br />Lump <br />r. <br />2019 Project <br />_.._.... ............... �........................ <br />$4,900.00 <br />Sum <br />____--- <br />4of8 <br />_._ <br />Supplemental <br />Agreement No. <br />3 <br />