My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Venues, Parks, and Arts 2020 Chemical Supply - Hartell's, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Venues, Parks, and Arts 2020 Chemical Supply - Hartell's, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:48:32 PM
Creation date
1/15/2020 9:55:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Disease <br />FI. Oz. per <br />1,000 sq. ft. <br />FI.Oz. <br />per Acre <br />Application <br />Interval/ <br />Timing <br />Instructions <br />Fusarlum Patch <br />2-4 <br />88-176 <br />Fall -Early <br />Apply when conditions are favor- <br />(Fusarium nivale) <br />Spring <br />able for disease development, <br />Yellow Patch <br />3-4 <br />130-176 <br />Late Fall <br />Apply one application in the late <br />(Rhizoctonia <br />fall before snow cover. Do not <br />cerealis) <br />apply on top of snow. If using a <br />3 fl. oz./1,000 sq. ft. rate, tank <br />mix with a registered contact <br />fungicide at the label rate. <br />Zoysia Patch, <br />3-4 <br />130-176 <br />Early Fall <br />Make one application in the <br />large patch of <br />early fall (mid -September to mid - <br />zoysia <br />October) prior to development of <br />(Rhizoctonia <br />disease symptoms. Consult local <br />solani) <br />turfgrass extension experts to <br />determine the optimum applica- <br />tion timing for your area. <br />Dichondra - Specific Disease, Rate, and Application Timing <br />Application <br />FI.Oz. per Fl. Oz. Interval/ <br />Disease 1,000 sq. ft. per Acre Timing Instructions <br />Dichondra Rust 2 88 14-21 days Apply when conditions are favor- <br />(Puccinia able for disease development. <br />dichondrae) <br />Establishment of Cool Season Turfgrass <br />Dorado provides control of many diseases of turf, and its primary use is as a fungicide <br />for use against the diseases listed on this label. As an additional benefit, Dorado will <br />improve the rate of establishment when it is applied to cool season grass seedlings or <br />sod. <br />New Seedlings: Apply 1 fl. ozJ1,000 sq. ft. at the 2 to 3-leaf stage of growth for faster <br />root development and top growth. <br />Sod: Apply 1 fl. oz./1,000 sq. ft. 2-6 weeks before cutting for increased sod knitting and <br />faster establishment after laying. <br />
The URL can be used to link to this page
Your browser does not support the video tag.