Laserfiche WebLink
✓E {yOV 01 <br />QUOTE/PROPOSAL' <br />CITY OF SOUTH BEND <br />PROJECT NAME 2020 Signal Knock Down & Wiring Investigation <br />PROJECT NO. 119-110 <br />QUOTES DUE Thursday, December <br />19th, <br />2019 <br />at 10:30am local <br />time <br />Item <br />No. <br />Description <br />Quantit <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />TS-2 Controller P-1 Foundation <br />3 <br />_ww <br />EA <br />2 <br />TS-2 Controller Cabinet, Install <br />1 <br />EA <br />3 <br />Signal Cantilever, Foundation <br />3 <br />EA <br />4 <br />Signal Cantilever Structure, Single Arm, Install <br />3 <br />EA <br />5 <br />Traffic Signal Head, 3 Section, Install <br />6 <br />EA <br />6 <br />Traffic Signal Head, 5 Section, Install <br />1 <br />EA <br />7 <br />Pedestrian Push Button Assembly, APS, Install <br />6 <br />EA <br />8 <br />Pedestrian Signal Head, Install <br />6 <br />EA <br />9 <br />... _..... _ ................. <br />Conduit, PVC Schedule 80, 3" <br />10 <br />LFT <br />_.................... <br />10 <br />Conduit, PVC Schedule 80, 2" <br />150 <br />LFT <br />11 <br />_..... .......� <br />Signal Cable, 3c/8 GA <br />1 15 <br />LFT <br />12 <br />Signal Cable, 504 GA <br />330 <br />LFT <br />w <br />13 <br />Signal Cable, 304 GA <br />75 <br />LFT <br />14 <br />Signal Cable, 704 GA _ <br />80 <br />LFT <br />15 <br />Street Identification Sign, Install <br />3 <br />EA <br />16 <br />Traffic Signal ISMA Certified Level 2 <br />8 <br />HR <br />Technician <br />17 <br />Laborer <br />8 <br />HR <br />18 <br />Licensed Electrician <br />8 <br />HR <br />ww_..... <br />Total <br />Amount <br />of Quote <br />$ <br />Firm: <br />Address: <br />City/State/Zip: <br />Telephone <br />Number: <br />Fax <br />Number: <br />( <br />) <br />Version 4/2/2019 <br />By <br />(Signature) <br />(Printed Name of Person Signing) <br />Page - 10 Public Works Quote <br />