My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Western Avenue Streetscape, Phase III Proj No. 118-076 - Indiana Earth, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - Western Avenue Streetscape, Phase III Proj No. 118-076 - Indiana Earth, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:58:12 PM
Creation date
12/23/2019 10:57:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ar i of <br />1 , <br />r � I <br />i <br />City of South Bend <br />RE: Western Ave Delays <br />We have encountered the following delays and are requesting all these days for an extension: <br />1) November 11,12,13 & 21 we had rain and snow days, soils could not be disturbed or concrete <br />placed = 4 days <br />2) Crews had winter conditions (16 days, see attachment) of winter weather slowing them down <br />and the concrete setting has been slowed by the colder temps. Concrete crews having to put <br />blankets on and take off the blankets and crews wearing heavier gear for the cold has slowed <br />production. 16 days x 3 hours per day = 48 hours at 8 hrs day = 6 days <br />3) The NIPSCO gas line encountered delayed work in the area at Lake Street until their line was re- <br />routed in November, the mainline concrete roadway could not be poured until this was <br />completed. = 12 days <br />4) The extra time for the AEP duct bank encountered at Lake Street = 1 day <br />5) The added concrete to install at the grass islands next to handicap ramps along with the added <br />walk on Lake south of Western = 1 day <br />Total days so far from list above: 24 days <br />Due to the unanticipated delays we expect our intermediate completion date of Dec 27, 2019. We <br />anticipate to open Western Ave for traffic in both directions on December 16, 2019 as discussed at our <br />weekly meeting on 12/4/19 and provided AEP has removed their utilities as planned. We are working <br />hard and continuing to work through the cold and rain days to gain on completion until weather does <br />not allow progress. <br />For in the spring of 2020. <br />Since the project encountered extra work and time delays, the permanent striping had to be put off until <br />the temperatures reach 50 degrees and dry in the spring. The temporary markings will be removed and <br />install the epoxy and thermoplastic markings once the temperatures allow. This work will take 3-4 good <br />weather days in April of 2020 along with the punch list work. <br />We are requesting 38 days in starting in April 2020 to complete this spring work which includes added <br />days due to the uncertainty of weather conditions during a normal April. INDOT anticipates 18 days in <br />April for weather, see attached weather for April last year showing 10 days. We suggest meeting in the <br />middle with 14 days for the weather conditions. The approval request submitted will eliminate the <br />potential for liquidated damages until May 7, 2020. <br />Final costs for winter conditions are not know at this time as they are still accumulating and the project <br />team has been notified. We will address these costs when finalized prior to the close of the project. <br />Respectfully, <br />Keith Stevens, Operations Manager <br />10343 McKinley Hwy. Osceola, IN 46561 • (574) 674-6488 • FAX (574) 674-6480 <br />
The URL can be used to link to this page
Your browser does not support the video tag.