Laserfiche WebLink
Addendum No. 1 <br />Riverwalk from Beyer Street to Howard Park <br />Project No. 117-083A <br />OWNER: City of South Bend <br />ENGINEER: Abonmarche Consultants, Inc. <br />Chad A. Knip, P.E. <br />PROJECT: Riverwalk from Beyer Street to Howard Park <br />Project No. 117-083A <br />SUBJECT: Clarifications and Additions to Contract Bidding Documents <br />TO: Plan Holders of Record <br />ISSUE DATE: December 3, 2019 <br />This Addendum No. 1 to the Plans and Specifications and Bidding shall supplement, amend, and <br />become part of these documents. All bids and construction contracts shall incorporate the items <br />addressed in this Addendum. <br />Pre -Bid Meeting <br />Attached to this Addendum is the sign in sheet from the pre -bid meeting. <br />Contractor's Bid for Public Works, Bid/Proposal <br />Sheets 7 through 11 of the Bid/Proposal issued with this addendum are to be used in the <br />submission of the bid <br />Sheets 7 through 11: <br />• Add Item B.58: "Hardwood Mulch, 60 CYD" <br />• Change quantity of Item B.43, Fence from 40 L-RT to 6 LFT <br />• Change description of item C.19 from , ' e a "' to Tree, Tulip Tree, 3" <br />• Add Item C.58: "Hardwood Mulch, 60 CYD" <br />Soil Borings <br />Borings logs from soil borings taken between the Cooper Bridge and Kernan Park are attached <br />to this addendum for informational purposes. <br />SPECIFICATIONS: <br />Section XII1, Prosecution and Progress: <br />Change: XI11.B.1 "The project will have a completion date of August4l4r,1020 September 18, <br />2019 for all work other than tree planting which shall be completed by November 30, 2020." <br />Sheet 2 of 23 <br />