Laserfiche WebLink
BID/PROPOSALa�d <br />°�",n <br />CITY OF SOUTH BEND <br />`"' % <br />Project <br />Name: Two -Way Conversion of Colfax Avenue — Phase II <br />"A <br />Project Number: 115-053B <br />For <br />Bids Due: November 26, 2019 <br />Contractor Name:" ,- <br />ALTERNATE #1 <br />Item <br />No. <br />Descri tion <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LSUM <br />2 <br />MOBILIZATION AND <br />DEMOBILIZATION <br />1 <br />LSUM <br />3 <br />CLEARING RIGHT OF WAY <br />1 <br />LSUM <br />4 <br />PAVEMENT, REMOVE <br />21 <br />SYS <br />c, --- <br />5 <br />CURB, CONCRETE, REMOVE <br />89 <br />LFT <br />C <br />0 2 p <br />6 <br />SIDEWALK, CONCRETE, REMOVE <br />62 <br />SYS <br />- <br />7 <br />EXCAVATION, COMMON <br />30 <br />CYS <br />Q5W, -� <br />8 <br />TEMPORARY PERIMETER <br />PROTECTION, SILT FENCE <br />60 <br />LFT <br />-- <br />9 <br />TEMPORARY INLET PROTECTION <br />3 <br />EA <br />10 <br />COSE ACTED AGGREGATE, NO. 53, <br />7 <br />TONBA <br />P <br />11 <br />RETROFITTED TIE BARS <br />30 <br />EA <br />m- <br />66 <br />12 <br />PCCP FOR PATCHING, 10 IN. <br />21 <br />SYS <br />13 <br />CURB RAMP, CONCRETE <br />36 <br />SYS <br />14 <br />DETECTABLE WARNING SURFACES <br />2 <br />EA <br />15 <br />1 SIDEWALK, CONCRETE, 4 IN, <br />11 <br />SYS <br />.. <br />l �- <br />16 <br />SIDEWALK, CONCRETE, 6IN. WITH <br />CURB <br />9 <br />SYS <br />G+0-1— <br />lI <br />17 <br />CURB, INTEGRAL, CONCRETE <br />89 <br />LFT <br />o <br />� <br />18 <br />SODDING, NURSERY <br />41 <br />SYS <br />19 <br />TOPSOIL <br />6 <br />CYS <br />n �.. <br />C> <br />20 <br />CASTING, ADJUST TO GRADE <br />3 <br />EA <br />21 <br />MAINTAINING TRAFFIC <br />1 <br />LSUM <br />Version 4/2/2019 Contractor's Bid for Public Works - 11 <br />