Laserfiche WebLink
5. List references from private firms for which you have performed work. <br />Gatlin Plumhint 1 Ie Itt�n}�, 111� 1 � 1 1 E. I aiii t: �rifl"ltl 1 Ms. ClarIr Mtlrplly _...... _.............. <br />Goo glI Inc. 220E E. 88"' Dr., Merrillville IN 464 10 Mr. Raymond C,ou glI <br />Dyer Construction Co., 1716 Sheffield Avenue, Dyer, IN Janet Furman <br />Grimmer Construction _C a wInc.M_2619 Maan,wStreet,mw, i; bland IN....Mr Gre nGrtmmer <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could <br />begin work, completed the project, number of workers, etc. and any other information which you believe would <br />enable the governmental unit consider your bid.) <br />As required by owner <br />2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have <br />performed part of the work) that you have used on public works projects during the past five (5) years along with a <br />brief description of the work done by each subcontractor. <br />See Attached List <br />3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be <br />used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a <br />listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed <br />project, you are under a continuing obligation to immediately notify the governmental unit in the event that you <br />subsequently determine that you will use a subcontractor on the proposed project. <br />Will supply upon award of contract <br />4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors <br />may also be required to be listed by the governmental unit. <br />........._...... <br />QUANTITY <br />ITEM <br />DESCRIPTION, <br />CONDITION <br />YEARS <br />PRESENT LOCATION <br />SIZE, CAPACITY, <br />OF <br />.......................................... <br />E,TC. <br />SERVICE <br />..._._.....�.......... �..._............................................................ <br />5 <br />Ashalt p Plants <br />Various <br />Good <br />Griffith, South Bend, <br />Val araiso, Lowell, LaPorte <br />19 <br />Asphalt Pavers <br />Various <br />Good <br />4 <br />Sli form Conc. Paver <br />Various <br />Good <br />...... .........�..................m....... <br />Griffith, South Bend <br />3 <br />Road Widener <br />Various <br />Good <br />Griffith, South Bend <br />5 <br />....._........_...................................�,. <br />Motor Graders <br />CAT/J.D. <br />...........�..._ <br />Good <br />........................................................................................ ......................... .__............ . <br />Griffith, South Bend <br />54 <br />Rollers <br />Various <br />Good <br />Griffith, South Bend <br />30 <br />Rubber Tire Loaders <br />Various <br />Good <br />Griffith, South Bend <br />15 <br />............. <br />Excavators <br />Various <br />Good <br />_............................ <br />........... ................. __........ �. __. <br />Griffith, South Bend <br />9 <br />Bulldozers <br />Various <br />Good <br />Griffith, South Bend <br />6 <br />LowBo Tractors <br />._ ....... ..._._._. <br />Various <br />Good <br />_. <br />............................................. <br />Griffith, South Bend <br />_._._ <br />8 <br />Flatbed Dum s <br />Vartous <br />Good <br />Griffith,Grlffth, South B end <br />48 <br />'/z and 3/4 ton Picku s <br />_.�.......... <br />Various <br />Good <br />Griffith, South Bend <br />65 <br />1 Ton Crew Trucks <br />Various <br />Good <br />Griffith, South Bend <br />3 <br />............__ <br />Cold Planers <br />Wirtgen 1900 <br />Good <br />Griffith, South Bend <br />DC <br />3 <br />Tri-Axle Dum <br />Mack <br />Good <br />South Bend <br />5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing <br />your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed. <br />Yes, we received quotes from potential subcontractors and suppliers <br />SECTION III CONTRACTOR'S FINANCIAL STATEMENT <br />4 <br />