My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 5 - Liberty Tower Exterior Renovations Proj. No 118-086R - Environmental Glass, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 5 - Liberty Tower Exterior Renovations Proj. No 118-086R - Environmental Glass, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:00:08 PM
Creation date
12/2/2019 2:50:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br />„ ms, DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-086R Project Name: Liberty Tower Improvements DivC Change <br />Order #: 5 <br />DATE INITIATED: 10/15/19 <br />BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Provide & Install 27 New Terrace Door Hinges, per owner Direction. <br />Attachments: (List documents support change — required) <br />Contractors cost. <br />Amount of Blncrease / ❑Decrease: $ 3,036.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $4,781.08 <br />ig Scope of Work <br />El Differing Site Conditions, Changed Conditions <br />Current Percent of Change: °98. % <br />❑ Conflicted Specifications and Drawings <br />. ................................_._._. r wwwwww <br />New Total Amount: $ 311,817.08 <br />m. El Failed Materials <br />❑ Error <br />El Omission <br />Total Percent of Change: m2.57 ^^^...., <br />� <br />❑ Final Quantity Adjustment <br />Funding Secured From: 0- - El <br />(filled out by PM) <br />RECOMMENDED BY: <br />Josh Ehmer <br />10/15/19 <br />Project Inspector (Print Name) <br />(Sign, "` <br />(Date) <br />REVIEWED BY: <br />7 .... <br />Construction Manager (Print Name) <br />(Signature) <br />(Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) <br />(Signatu <br />(Date) <br />APPROVED BY: <br />Y t� <br />P4 <br />City Engineer (Print Na e) <br />(Sign tur) <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.