My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Edison Well #3A Rehabilitation - Peerless Midwest
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Quotations/Proposals
>
Award Quote - Edison Well #3A Rehabilitation - Peerless Midwest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:08:18 AM
Creation date
12/2/2019 2:22:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227 W.JEFFERSON BOULEVARD <br />SUITE 1316 <br />SOUTH BEND, IN 46601-1830 <br />PHONE: 574/235-9251 <br />FAX: 574/235-9171 <br />CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR <br />DEPARTMENT OF PUBLIC WORKS <br />ERIC HORVATH, DIRECTOR <br />October 281h, 2019 <br />Peerless Midwest <br />55860 Russell Industrial Parkway <br />Mishawaka, IN 46545 <br />RE: Request for Quotations <br />Edison Well #3A Rehabilitation <br />Project Number: 119-097 <br />Dear Sir or Madam: <br />The City of South Bend solicits your quotation for the Edison Well #3A Rehabilitation <br />project, which includes the furnishing of all equipment, material, insurance, and labor to facilitate the <br />cleaning, inspection, rehabilitation, and motor replacement for Well Pump No. 3A at the Edison Well Field <br />located at 2708 Rockne Drive, within the City of South Bend, IN. <br />Attached are the quote specifications. Please review them carefully prior to the submission of <br />your quote. <br />Your sealed quote is due to the City of South Bend Department of Public Works, 227 W. <br />Jefferson Blvd., Room 1316, South Bend, IN 46601 by 9:30 A.M., Local Time, Tuesday, <br />November 12, 2019. Any quotes received after this time will not be opened. All quotes received <br />by this time will be opened and an award will likely be made at the Board of Public Works Meeting at <br />9:30 A.M., Local Time, Tuesday, November 26, 2019. <br />Upon reward, all required documentation must be provided to the Clerk of the Board of <br />Public Works within seven days. <br />There will be a walkthrough for the above project on Wednesday, October 30, 2019. If you <br />have any questions or concerns, please contact me at (574) 235-5998 or by email at <br />014 ntr il, sSO IIllbetidiii. . <br />Best Regards, <br />Rebecca Plantz <br />Engineer I <br />Enc.: Edison Well #3A Rehabilitation Quote Specifications <br />c: File <br />
The URL can be used to link to this page
Your browser does not support the video tag.