Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project <br />Name: Historic Leeper Park Improvements <br />- Bid Package <br />2 <br />Project <br />Number: 118-010B <br />For <br />Bids Due: Otto ber 22, 2019 <br />._._--------- <br />........ _ <br />m <br />Contractor <br />Name: Northern Indiana Construction <br />Company <br />Inc. <br />BASE BID <br />ITEM <br />QUANTITY <br />UNIT <br />UNIT <br />ITEM <br />COST <br />TOTAL <br />1 <br />CONSTRUCTION ENGINEERING <br />1.00 <br />LS <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />.... <br />1.00 <br />LS <br />�22 242.-22 <br />-.._ <br />242.0 <br />3 <br />MAINTAINING TRAFFIC <br />1.00 <br />LS <br />8 445. <br />8 445.0 <br />4 <br />SHRUB, REMOVE <br />11.00 <br />EACH <br />40. <br />440.00 <br />5 <br />TREE, 8 IN., REMOVE <br />....W ...... <br />1.00 <br />- . <br />EACH <br />75 <br />75.0 <br />6 <br />TREE, 10 IN., REMOVE <br />1.00 <br />EACH <br />120. <br />120.0 <br />7 <br />TREE, 16 IN., REMOVE <br />...... <br />3.00 <br />_.......r__ <br />EACH <br />....... <br />8 <br />.......... <br />TREE, 28 IN., REMOVE <br />_ .... .... <br />1.00 <br />µ <br />EACH <br />900mmIT <br />900.0 <br />9 <br />TREE PROTECTION <br />1.00 _. <br />mmmLS <br />1,000. <br />1,000.0( <br />10 <br />CONCRETE STEPS, REMOVE <br />....W W <br />1.00 <br />LS <br />300. <br />300.0 <br />11 <br />GUARDRAIL, REMOVE <br />52.00 <br />................ <br />LFT <br />5.60 <br />291.2( <br />12 <br />12 IN. STORM SEWER, REMOVE <br />104.00 <br />LFT <br />50. <br />5,200.0( <br />13 <br />24 IN. STORM SEWER, REMOVE <br />64.00 <br />LFT <br />85 <br />5,440.00 <br />14 <br />CATCH ... BASIN, REMOVE <br />........... ........ <br />4.00 <br />EACH <br />950. <br />3,800.0 <br />15 <br />CURB AND GUTTER, REMOVE <br />312.00 <br />LFT <br />12. <br />3 744.0 <br />16 <br />CURB, CONCRETE, REMOVE <br />274.00 <br />LFT <br />12 <br />3 288.0 <br />17 <br />SIDEWALK, CONCRETE REMOVE <br />230.00 <br />.. <br />SYS <br />..-........... .......- <br />15.90 <br />3,657.0 <br />18 <br />CONCRETE APPROACH, REMOVE <br />55.00 <br />SYS <br />26,95 <br />........ 1,482.2) <br />19 <br />FENCE, CHAIN LINK, REMOVE <br />83.00 <br />LFT <br />11.00 <br />913.0 <br />20 <br />SALVAGE STEPS <br />1.00 <br />EACH <br />-1.00. <br />.1 100.0 <br />21 <br />_..... <br />SALVAGE BENCH <br />........_.. <br />1.00 <br />........ <br />EACH <br />_....24 <br />245.,0 <br />22 <br />DEWATERING <br />1.00 <br />LS <br />60,000. <br />60, 000.0 <br />23 <br />..... ..............................� ......ww <br />EXCAVATION, COMMON <br />150.00 <br />_........ <br />CYS <br />.... <br />......... 85, <br />12, 7.50....0.. <br />24 <br />BORROW <br />50.00 <br />CYS <br />........ <br />50 <br />2,500.00 <br />25 <br />SUBGRADE TREATMENT, TYPE II <br />363.00 <br />SYS <br />35, <br />12, 705.0 <br />26 <br />COMPACTED AGGREGATE #53, BASE <br />88.00 <br />CYS <br />1 125, <br />11,000.0 <br />27 <br />MILLING, ASPHALT, 1.5 IN. <br />32.00 <br />SYS <br />0 <br />28 <br />HMA FOR PATCHING <br />17.00 <br />TON <br />265, <br />....... <br />4,505.00 <br />29 <br />ASPHALT SURFACE <br />3.00 <br />TON <br />925KK <br />2,775.00 <br />Version 1/17/2019 Contractor's Bid for Public Works - 45 <br />