BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project
<br />Name: Historic Leeper Park Improvements
<br />- Bid Package
<br />2
<br />Project
<br />Number: 118-010B
<br />For
<br />Bids Due: Otto ber 22, 2019
<br />._._---------
<br />........ _
<br />m
<br />Contractor
<br />Name: Northern Indiana Construction
<br />Company
<br />Inc.
<br />BASE BID
<br />ITEM
<br />QUANTITY
<br />UNIT
<br />UNIT
<br />ITEM
<br />COST
<br />TOTAL
<br />1
<br />CONSTRUCTION ENGINEERING
<br />1.00
<br />LS
<br />2
<br />MOBILIZATION AND DEMOBILIZATION
<br />....
<br />1.00
<br />LS
<br />�22 242.-22
<br />-.._
<br />242.0
<br />3
<br />MAINTAINING TRAFFIC
<br />1.00
<br />LS
<br />8 445.
<br />8 445.0
<br />4
<br />SHRUB, REMOVE
<br />11.00
<br />EACH
<br />40.
<br />440.00
<br />5
<br />TREE, 8 IN., REMOVE
<br />....W ......
<br />1.00
<br />- .
<br />EACH
<br />75
<br />75.0
<br />6
<br />TREE, 10 IN., REMOVE
<br />1.00
<br />EACH
<br />120.
<br />120.0
<br />7
<br />TREE, 16 IN., REMOVE
<br />......
<br />3.00
<br />_.......r__
<br />EACH
<br />.......
<br />8
<br />..........
<br />TREE, 28 IN., REMOVE
<br />_ .... ....
<br />1.00
<br />µ
<br />EACH
<br />900mmIT
<br />900.0
<br />9
<br />TREE PROTECTION
<br />1.00 _.
<br />mmmLS
<br />1,000.
<br />1,000.0(
<br />10
<br />CONCRETE STEPS, REMOVE
<br />....W W
<br />1.00
<br />LS
<br />300.
<br />300.0
<br />11
<br />GUARDRAIL, REMOVE
<br />52.00
<br />................
<br />LFT
<br />5.60
<br />291.2(
<br />12
<br />12 IN. STORM SEWER, REMOVE
<br />104.00
<br />LFT
<br />50.
<br />5,200.0(
<br />13
<br />24 IN. STORM SEWER, REMOVE
<br />64.00
<br />LFT
<br />85
<br />5,440.00
<br />14
<br />CATCH ... BASIN, REMOVE
<br />........... ........
<br />4.00
<br />EACH
<br />950.
<br />3,800.0
<br />15
<br />CURB AND GUTTER, REMOVE
<br />312.00
<br />LFT
<br />12.
<br />3 744.0
<br />16
<br />CURB, CONCRETE, REMOVE
<br />274.00
<br />LFT
<br />12
<br />3 288.0
<br />17
<br />SIDEWALK, CONCRETE REMOVE
<br />230.00
<br />..
<br />SYS
<br />..-........... .......-
<br />15.90
<br />3,657.0
<br />18
<br />CONCRETE APPROACH, REMOVE
<br />55.00
<br />SYS
<br />26,95
<br />........ 1,482.2)
<br />19
<br />FENCE, CHAIN LINK, REMOVE
<br />83.00
<br />LFT
<br />11.00
<br />913.0
<br />20
<br />SALVAGE STEPS
<br />1.00
<br />EACH
<br />-1.00.
<br />.1 100.0
<br />21
<br />_.....
<br />SALVAGE BENCH
<br />........_..
<br />1.00
<br />........
<br />EACH
<br />_....24
<br />245.,0
<br />22
<br />DEWATERING
<br />1.00
<br />LS
<br />60,000.
<br />60, 000.0
<br />23
<br />..... ..............................� ......ww
<br />EXCAVATION, COMMON
<br />150.00
<br />_........
<br />CYS
<br />....
<br />......... 85,
<br />12, 7.50....0..
<br />24
<br />BORROW
<br />50.00
<br />CYS
<br />........
<br />50
<br />2,500.00
<br />25
<br />SUBGRADE TREATMENT, TYPE II
<br />363.00
<br />SYS
<br />35,
<br />12, 705.0
<br />26
<br />COMPACTED AGGREGATE #53, BASE
<br />88.00
<br />CYS
<br />1 125,
<br />11,000.0
<br />27
<br />MILLING, ASPHALT, 1.5 IN.
<br />32.00
<br />SYS
<br />0
<br />28
<br />HMA FOR PATCHING
<br />17.00
<br />TON
<br />265,
<br />.......
<br />4,505.00
<br />29
<br />ASPHALT SURFACE
<br />3.00
<br />TON
<br />925KK
<br />2,775.00
<br />Version 1/17/2019 Contractor's Bid for Public Works - 45