Laserfiche WebLink
BID/PROPOSAL <br />�.Q <br />CITY OF SOUTH BEND <br />Project <br />Name: Historic Leeper Park Improvements <br />- Bid Package <br />2 <br />Project <br />- .......... ....... <br />Number: 118-010B <br />....-...�..... <br />...M <br />For <br />Bids Due: October 22, 2019 <br />.......... _- <br />_..MOO <br />Contractor <br />Name: Northern Indiana Construction <br />Company <br />Inc. <br />60 <br />EROSION CONTROL <br />1.00 <br />- <br />LS <br />g r_975. <br />_..... <br />8 975.0 <br />61 <br />PED CROSSING SIGNS - RRFB WITH <br />PUSHBUTTON <br />3.00 <br />EACH <br />8 837 <br />26,511.0 <br />62 <br />PANEL SIGN <br />... <br />4.00 <br />EACH <br />775. <br />3,100.0 <br />63 <br />LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN. <br />.�...... <br />53.00 <br />.....- <br />LFT <br />159.0 <br />64 <br />LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN, <br />250.00 <br />LFT <br />3, <br />750.0 <br />65 <br />LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN. <br />295.00 <br />........_ <br />LFT <br />5. <br />1,475.0( <br />66 <br />TRANSVERSE MARKING, THERMOPLASTIC, STOP <br />LINE, WHITE, 24 IN. <br />14.00 <br />LFT <br />18. <br />252.0 <br />67 <br />TRANSVERSE MARKING THERMOPLASTIC, <br />CROSSWALK LINE, , 24IN. <br />WHITE <br />205.00 <br />LFT <br />18. <br />3,690.0 <br />68 <br />TRANSVERSE MARKING, MULTI -COMPONENT, <br />CROSSWALK LINE, WHITE, 24 IN. <br />322.00 <br />LFT <br />13. <br />4,186'.0 <br />TRANSVERSE MARKING, MULTI -COMPONENT, <br />........ <br />69 <br />SOLID, WHITE, 6 IN. <br />104.00 <br />LFT <br />3. <br />312.0 <br />70 <br />PAVEMENT MESSAGE MARKING, MULTI- <br />COMPONENT, LANE INDICATION ARROW <br />2.00 <br />EACH <br />95. <br />190.0 <br />71 <br />GROOVING FOR PAVEMENT MARKINGS <br />253.00 <br />LFT <br />2.35 <br />594.5 <br />72 <br />PAINT <br />_ <br />1.00 <br />LS <br />1 , 500.0 <br />73 <br />BIKE RACK INSTALLATION <br />4.00 <br />EACH <br />215, <br />860.0 <br />74 <br />MULCHED NATIVE SEED <br />_. .._W......_....... <br />...... .�..... <br />0.50 <br />- .............. <br />LBS <br />3,890. <br />1,945.0( <br />75 <br />....._ <br />EROSION CONTROL BLANKET <br />53.00 <br />SYS <br />8.75 <br />463.7 <br />76 <br />. <br />BOLLARD ......�.__....._ <br />......_ _�- .......... <br />2.00 <br />EACH <br />925 «..�._ <br />. <br />850.0 <br />BASE BID TOTAL <br />813, 360.05 <br />ALTERNATE 1 BID <br />ITEM <br />1 1I INDIANA BOULDERS <br />117.00 <br />ALTERNATE BID TOTAL <br />Version 1/17/2019 Contractors Bid for Public Works - 47 <br />UNIT UNIT ITEM <br />COST TOA <br />TON gtin nn 130T.4L20. <br />30,420.00 <br />