Change Order No 3 - VPA Restroom Remodeling Proj No 118-043R - Michiana Contracting Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - VPA Restroom Remodeling Proj No 118-043R - Michiana Contracting Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:58:01 PM
Creation date
11/14/2019 10:30:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mailing Address <br />P.O. Box 929 <br />Plymouth, IN 46563 <br />9/19/19 <br />City of South Bend <br />Greg McGowen <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />RE: Project No. 118-043R Venues, Parks and Arts Restroom Remodeling Contract Time Extension <br />Due to design Issues at Veterans Memorial Park <br />Greg, <br />As you are aware, plumbing issues were encountered during the demolition of the block wall <br />at Veteran's Park August 27th. The original design called for wall hung toilets with flush values that which would <br />not work at this location. It was determined that these toilets needed to be changed to floor mount units. <br />In addition, the shut off valve in the pit was broken and could not be completely turned off. The plumbing work at <br />this location was put on hold for several weeks until a decision was reached on how to proceed. <br />Parts for the new water valve are on order, along with the parts needed to make toilet and flush valve changes. <br />We anticipate these parts arriving sometime next week. <br />The plumbers have been at a standstill since 8/28/19 and were able to start on some work 9/18/19 while <br />still waiting for parts for the pit shut off valve. As a result of these delays we are requesting a contract time <br />extension until 10/11/19. This will allow us the time needed to procure the parted needed and complete the <br />work. <br />On 9/18/19 it was discovered that the men's restroom has no floor drain which is required by code. If a new drain <br />is required to be installed, additional time will be needed. <br />Please let me know if you have any questions or need any additional information. <br />Mark Livinghouse <br />Project Manager <br />Michiana Contracting <br />MICHIANA CONTRACTING, INC. Shipping Address: 7843 Lilac Road Plymouth, IN 46563 <br />Tel: 574-936-8613 Fax: 574-936-6201 www,w�iiiciiiati contractin co <br />
The URL can be used to link to this page
Your browser does not support the video tag.