My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - VPA Restroom Remodeling Proj No 118-043R - Michiana Contracting Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - VPA Restroom Remodeling Proj No 118-043R - Michiana Contracting Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:58:01 PM
Creation date
11/14/2019 10:30:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a, DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-043R Project Name: VPA Restr worn Remodeling Change Order #: 3 <br />DATE INITIATED: 10/15/19 BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Replace main shut-off valve at Vet's Memorial- $3,390 <br />Miscellaneous unforeseen costs at Rum Village and Pinhook- $668 <br />Unforeseen delays- Extend completion to 10/11/2019 <br />Attachments: (List documents support change - required) <br />Contractor's cost explanations and time extension request. <br />Amount of BIncrease/ ❑Decrease: $ 4058 <br />"""""' Categories (Pick One): <br />Previously approved Change Order(s): $ 35250.82 B Scope of Work <br />.- - El <br />Site Conditions, Changed Conditions <br />Current Percent of Change: 0'77 % ❑ Conflicted Specifications and Drawings <br />.. ❑Failed Materials <br />New Total Amount: $ 529, 308.82 <br />❑ Error <br />❑ Omission <br />Total Percent of Change: 8.02 <br />❑ Final Quantity Adjustment <br />Funding Secured From <br />(filled out by PM) <br />RECOMMENDED BY: <br />rr <br />Project Inspector (Print Name) iiegnature) (Date) <br />REVIEWED BY: <br />Construction Man ger (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />City Engineer (Print Name) (Signature) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.