My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 & PCA - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Order & Project Completion Affidavits
>
Change Order No 4 & PCA - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:06:49 AM
Creation date
10/23/2019 11:44:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAINTENANCE BOND <br />KNOW ALL MEN BY THESE PRESENTS: <br />Bond No. MNT9292251 <br />That HRP Construction Inc., PO Box 266, South Bend, IN 46624-0266 <br />as Principal, hereinafter call Contractor, and Fideli and De osit Com an of Maryland <br />Chicago, IL as Surety, hereinafter call Surety, are held and firmly bound unto <br />City of South Beni Board ofPub] .ic Works , as Obliges, hereinafter called Owner, in the penal sum of <br />$48,487 00 , for the payment whereof Contractor and Surety bind themselves, their heirs, executors, <br />administrators, successors, and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, Contractor has by written agreement, dated August 14, 2018 <br />entered into a contract with Owner for Miami Street Basin Draina c Ins rovesnents Pro ect• Project No, I I6-082C , <br />in accordance with the General Conditions, the Drawings and Specifications, which contract is by reference incorporated herein, <br />and made a part hereof, and is referred to as the Contract. <br />NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall remedy any defects due to faulty materials or <br />workmanship, and pay for any damage to other work resulting therefrom, which shall appear within a period of three Q year(s) <br />from the date of substantial completion of the work provided for in the Contract, then this obligation to be void; otherwise to <br />remain in full force and effect. <br />Bond shall be effective from June 21, 2019 to June 21, 2022. <br />PROVIDED, HOWEVER, that Owner shall give Contractor and Surety notice of observed defects with reasonable promptness. <br />SIGNED and sealed this 25th day of September 2019 <br />,y Matthew D. Cain, President <br />Fidelity and Deposit 0,ni,ipany of Maryland <br />B (Seal) <br />JeXiniter L. I asznia <br />
The URL can be used to link to this page
Your browser does not support the video tag.