My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal Award - Corby Blvd-Ironwood Dr-Rockne Dr - Project No 116-034 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Quotations/Proposals
>
Proposal Award - Corby Blvd-Ironwood Dr-Rockne Dr - Project No 116-034 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:12:00 AM
Creation date
10/9/2019 11:43:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Roger Nawrot, Assistant City Engineer <br />Alicia Czarnecki, Project Engineer <br />SUBJECT: Contract Award — Project 116-034 <br />DATE: September 27, 2019 <br />mdnoouuaru uui. uu w�roww�mwuu�w ���mm.� iiiii Wuuuuwmuuuuui <br />On May 28, 2019, the Board of Public Works opened letters of interests (LOls) for the construction <br />inspection for Corby Blvd/Ironwood Drive/Rockne Drive Intersection Improvement (Prof. No. 116- <br />034) project and submitted the letters to engineering for review and scoring. The following <br />consultants submitted LOls and were ranked according to engineering: <br />Weighted <br />Consultants <br />Scores <br />Ranking <br />Total <br />Lochmueller Group <br />266.3 <br />1 <br />DLZ Indiana, LLC <br />------------- <br />208.3 <br />2 <br />Troyer Group <br />148.9 <br />3 <br />HWC Engineering <br />145.4 <br />4 <br />The Division of Engineering recommends the award of a contract for the Corby Blvd/Ironwood <br />Dave/Rockne Drive Intersection Improvement to Lochmueller Group in the amount of <br />$406,400.00. Sufficient funds have been appropriated from LRSA Capital (251-0608-431.42-96). <br />Please call with any questions. <br />Attachment: Engineering Scoring Tabulation <br />What we do today makes a difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.