My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:03:47 PM
Creation date
9/25/2019 3:17:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GUMWOOD ROAD RECONS,,,,I,,.RUC ,,,,I ION, <br />, <br />11 1ASE I & III <br />7a .,JOSEPH COf,DN7"'Y <br />Gumwood Road was a large-scale reconstruction project with <br />several challenges. Despite the complexities, our team was able to <br />work with the contractor, the County, and other stakeholders to <br />foresee potential problems and adjust schedules and the order of <br />work to eliminate or mitigate them. (hj cw 1pted) dI fvu <br />Nei o,lv t on rhine, amd undk):rVu�u�f,���,6.0 <br />PROJECT WORK INCLUDED <br />2 miles of added travel lanes <br />Converting 2 conventional intersections to roundabouts <br />New storm sewers, retention basins, & sanitary sewer lines <br />Lighting, sidewalks, & landscaping <br />Upgrading driveways & curb ramps to meet ADA standards <br />Adding a multi -use path <br />EAST BAINIK, PHASE IV <br />CITY OF SOUT14 BEND <br />Members of our team performed construction inspection services <br />for the East Bank sewer separation project. The project limits <br />extend from the roads south of South Bend Avenue from Hill Street <br />to Francis Street, Madison Street being the furthest street south. <br />PROJECT ELEMENTS <br />The purpose of this project was for the sewer separation of a <br />combined sewer through the installation of new storm sewers. The <br />disturbed half of the street was repaired with new pavement while <br />the remainder of the street received a pavement overlay. New <br />curb, gutter, and sidewalks were also placed on the disturbed half <br />of the street. <br />In addition, over 1.5 miles of new storm sewer and over 150 new <br />structures, along with new water services and some new water <br />lines, were installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.